Hendon
HENLondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
Hendon had 52,631 scheduled stops to Period 7 of 2026-27, about 145 a day. 75.8% of recorded arrivals were within three minutes of the timetable and 7.4% of scheduled stops were cancelled.
Hendon opened on 13 July 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Brondesbury is the oldest (1860) and Brent Cross West the newest (2023), with Hendon in between.
The nearest stations to Hendon are Brent Cross West (1.5 km south-east), Cricklewood (3.0 km south-east), Mill Hill Broadway (3.7 km north), Wembley Stadium (4.3 km south-west) and Brondesbury (4.6 km south-east). 65 stations lie within 10 km in all. Of the five, Wembley Stadium is the most punctual at 88.2% and Mill Hill Broadway the least at 70.4%, with Hendon on 75.8%.
Hendon is one of 3 stations named after an area of London called Hendon, home to about 35,874 people; this one stands 1.0 km from its centre.
Cancellations are a particular problem at Hendon. 7.4% of scheduled stops did not happen, 2.7 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2327th of 2,374.
2 of 3 stations of a similar size in London are more punctual than Hendon on 75.8%. The comparison group includes Cricklewood (72.3%), South Hampstead (92.6%) and Motspur Park (86.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 52,629 | 75.8% | 7.4% |
| East Midlands Railway | 2 | – | – |
Operators with their own page for this station are linked to it.
Late train at Hendon? Delay Repay
These operators call at Hendon and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,119 | 73.5% | 5.8% |
| Period 6 of 2026-27 | 4,083 | 69.8% | 8.6% |
| Period 5 of 2026-27 | 4,134 | 72.9% | 10.4% |
| Period 4 of 2026-27 | 4,073 | 74.0% | 5.0% |
| Period 3 of 2026-27 | 3,392 | 75.1% | 6.5% |
| Period 2 of 2026-27 | 3,796 | 77.7% | 5.0% |
| Period 1 of 2026-27 | 4,595 | 79.3% | 5.7% |
| Period 13 of 2025-26 | 4,506 | 80.4% | 5.9% |
| Period 12 of 2025-26 | 4,202 | 79.8% | 5.2% |
| Period 11 of 2025-26 | 4,162 | 72.9% | 9.2% |
| Period 10 of 2025-26 | 3,413 | 77.2% | 10.4% |
| Period 9 of 2025-26 | 4,059 | 75.0% | 12.1% |
| Period 8 of 2025-26 | 4,097 | 77.1% | 6.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cricklewood | 52,629 | 72.3% | 7.3% |
| South Hampstead | 52,537 | 92.6% | 3.2% |
| Motspur Park | 52,278 | 86.1% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out