Cricklewood
CRILondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
Cricklewood had 52,629 scheduled stops to Period 7 of 2026-27, about 145 a day. 72.3% of recorded arrivals were within three minutes of the timetable and 7.3% of scheduled stops were cancelled.
Cricklewood opened on 2 May 1870, 156 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Brondesbury is the oldest (1860) and Brent Cross West the newest (2023), with Cricklewood in between.
The nearest stations to Cricklewood are Brent Cross West (1.5 km north-west), Brondesbury (1.7 km south-east), West Hampstead Thameslink (1.8 km south-east), West Hampstead (1.9 km south-east) and Brondesbury Park (2.0 km south). 86 stations lie within 10 km in all. At 72.3%, Cricklewood is less punctual than all of them; the best of the five, Brondesbury Park, manages 78.3%.
Cricklewood takes its name from an area of London called Cricklewood, and the station stands 0.5 km from its centre.
For Cricklewood, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 65.6% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2023-24, at 89.2%, which is 23.6 percentage points higher. Cancellations peaked at 16.1% of scheduled stops in Period 9 of 2024-25, against 7.3% over the latest 13 periods.
Compared with 3 stations of a similar size in London, Cricklewood is the least punctual, at 72.3%. All of them are ahead, including Hendon (75.8%), South Hampstead (92.6%) and Motspur Park (86.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 52,624 | 72.3% | 7.3% |
| East Midlands Railway | 5 | – | – |
Operators with their own page for this station are linked to it.
Late train at Cricklewood? Delay Repay
These operators call at Cricklewood and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,120 | 69.7% | 5.8% |
| Period 6 of 2026-27 | 4,083 | 65.6% | 8.4% |
| Period 5 of 2026-27 | 4,132 | 69.5% | 10.3% |
| Period 4 of 2026-27 | 4,073 | 71.0% | 4.8% |
| Period 3 of 2026-27 | 3,393 | 72.1% | 6.5% |
| Period 2 of 2026-27 | 3,794 | 73.9% | 4.8% |
| Period 1 of 2026-27 | 4,599 | 76.4% | 5.6% |
| Period 13 of 2025-26 | 4,506 | 77.2% | 5.8% |
| Period 12 of 2025-26 | 4,202 | 76.1% | 4.9% |
| Period 11 of 2025-26 | 4,163 | 68.7% | 9.8% |
| Period 10 of 2025-26 | 3,410 | 73.3% | 10.5% |
| Period 9 of 2025-26 | 4,057 | 71.6% | 12.1% |
| Period 8 of 2025-26 | 4,097 | 73.7% | 6.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hendon | 52,631 | 75.8% | 7.4% |
| South Hampstead | 52,537 | 92.6% | 3.2% |
| Motspur Park | 52,278 | 86.1% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out