Chiltern Railways at Solihull
All trains at SolihullChiltern Railways across BritainWest Midlands
How this operator is doing here
Chiltern Railways had 24,256 scheduled stops at Solihull in the 13 periods to Period 7 of 2026-27, 53% of the station's total. 84.8% of recorded arrivals came within three minutes and 1.2% of stops were cancelled.
Chiltern Railways trains at Solihull also serve Widney Manor (2.3 km south-east, – on time, – cancelled), Olton (2.9 km north, – on time, – cancelled), Acocks Green (4.4 km north-west, – on time, – cancelled), Dorridge (5.3 km south-east, 83.0% on time, 1.2% cancelled), Bordesley (8.8 km north-west, – on time, – cancelled) and Lapworth (9.2 km south-east, 82.4% on time, 1.3% cancelled), which are the stations on its network closest to Solihull.
Within 30 km of here, Chiltern Railways runs best at Stratford-upon-Avon Parkway, 23.5 km south (92.7%), and worst at Lapworth, 9.2 km south-east (82.4%).
The busiest Chiltern Railways station within 30 km of Solihull is Leamington Spa, 22.5 km south-east, with about 81 scheduled stops a day.
Of the 2 operators with enough records at Solihull, Chiltern Railways is the least punctual, at 84.8%.
Chiltern Railways at Solihull has slipped a little, from 87.7% within three minutes in the previous 13 periods to 84.8% in the latest 13, a fall of 2.9 percentage points. Cancellations held steady at 1.2% of scheduled stops, against 1.1% before.
Period by period
See how Chiltern Railways Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,862 | 81.8% | 0.5% |
| Period 6 of 2026-27 | 1,827 | 81.2% | 0.9% |
| Period 5 of 2026-27 | 1,808 | 79.0% | 1.3% |
| Period 4 of 2026-27 | 1,839 | 78.4% | 2.1% |
| Period 3 of 2026-27 | 1,773 | 82.0% | 0.8% |
| Period 2 of 2026-27 | 1,903 | 84.6% | 1.1% |
| Period 1 of 2026-27 | 2,146 | 89.6% | 0.7% |
| Period 13 of 2025-26 | 1,984 | 89.1% | 1.5% |
| Period 12 of 2025-26 | 1,833 | 90.3% | 0.5% |
| Period 11 of 2025-26 | 1,849 | 89.1% | 1.0% |
| Period 10 of 2025-26 | 1,714 | 86.5% | 0.6% |
| Period 9 of 2025-26 | 1,799 | 85.5% | 1.7% |
| Period 8 of 2025-26 | 1,919 | 83.5% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Solihull
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 21,770 | 90.2% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out