Chiltern Railways at Smethwick Galton Bridge
All trains at Smethwick Galton BridgeChiltern Railways across BritainWest Midlands
On time, last 13 periods–Whole station: 80.2%
Cancelled–Whole station: 3.6%
Scheduled stops576Of 90,011 at the station
How this operator is doing here
There are not enough usable records of Chiltern Railways at Smethwick Galton Bridge to report how punctual it is.
Period by period
See how Chiltern Railways Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 46 | – | – |
| Period 6 of 2026-27 | 46 | – | – |
| Period 5 of 2026-27 | 44 | – | – |
| Period 4 of 2026-27 | 48 | – | – |
| Period 3 of 2026-27 | 42 | – | – |
| Period 2 of 2026-27 | 47 | – | – |
| Period 1 of 2026-27 | 49 | – | – |
| Period 13 of 2025-26 | 49 | – | – |
| Period 12 of 2025-26 | 48 | – | – |
| Period 11 of 2025-26 | 41 | – | – |
| Period 10 of 2025-26 | 34 | – | – |
| Period 9 of 2025-26 | 41 | – | – |
| Period 8 of 2025-26 | 41 | – | – |
Other operators at Smethwick Galton Bridge
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 89,435 | 80.1% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out