Smallbrook Junction
SABSouth EastManaged by South Western Railway (Island Line)
How this station is performing
Smallbrook Junction has usable figures for 11 of the last 13 four-week periods to Period 7 of 2026-27, covering 4,147 scheduled stops, about 11 a day. In those periods 97.9% of stops arrived within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Smallbrook Junction opened on 21 July 1991, 35 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Smallbrook Junction is the newest; the oldest, Ryde St Johns Road, opened in 1864.
The nearest stations to Smallbrook Junction are Ryde St Johns Road (1.4 km north), Ryde Esplanade (2.4 km north), Ryde Pier Head (3.1 km north), Brading (3.9 km south) and Sandown (6.1 km south). 7 stations lie within 10 km in all. At 97.9%, Smallbrook Junction is less punctual than all of them; the best of the five, Brading, manages 98.7%.
Across the whole run of data, the weakest four-week period for Smallbrook Junction was Period 4 of 2023-24, at 70.9%, some time before the latest year. The strongest was Period 9 of 2025-26, at 100.0%, and the two are 29.1 percentage points apart. Cancellations peaked at 24.1% of scheduled stops in Period 8 of 2023-24, against 1.3% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Smallbrook Junction is the most punctual, at 97.9%. The comparison group includes Tackley (76.4%), Faygate (73.6%) and Appleford (76.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 4,147 | 97.9% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Smallbrook Junction? Delay Repay
These operators call at Smallbrook Junction and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 484 | 98.1% | 0.8% |
| Period 6 of 2026-27 | 584 | 96.6% | 3.1% |
| Period 5 of 2026-27 | 650 | 97.2% | 0.8% |
| Period 4 of 2026-27 | 526 | 98.1% | 0.0% |
| Period 3 of 2026-27 | 374 | 98.7% | 0.0% |
| Period 2 of 2026-27 | 514 | 97.9% | 1.2% |
| Period 1 of 2026-27 | 446 | 98.2% | 0.4% |
| Period 13 of 2025-26 | 194 | 99.0% | 0.0% |
| Period 12 of 2025-26 | 134 | 97.4% | 13.4% |
| Period 11 of 2025-26 | 0 | – | – |
| Period 10 of 2025-26 | 54 | – | – |
| Period 9 of 2025-26 | 111 | 100.0% | 0.0% |
| Period 8 of 2025-26 | 76 | 98.7% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out