Faygate
FGTSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Faygate had 6,238 scheduled stops to Period 7 of 2026-27, about 17 a day. 73.6% of recorded arrivals were within three minutes of the timetable and 6.3% of scheduled stops were cancelled.
Faygate opened on 14 February 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Faygate is the oldest; the next oldest, Horsham, dates from 1848.
The nearest stations to Faygate are Littlehaven (3.6 km south-west), Ifield (4.1 km north-east), Warnham (4.6 km west), Horsham (5.1 km south-west) and Crawley (5.6 km east). 10 stations lie within 10 km in all. Of the five, Ifield is the most punctual at 80.9% and Crawley the least at 71.7%, with Faygate on 73.6%.
Faygate takes its name from a Village called Faygate, and the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Faygate was Period 9 of 2024-25, at 57.4%, some time before the latest year. The strongest was Period 1 of 2025-26, at 85.1%, and the two are 27.7 percentage points apart. Cancellations peaked at 19.8% of scheduled stops in Period 7 of 2024-25, against 6.3% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Faygate on 73.6%. The comparison group includes Tackley (76.4%), Appleford (76.1%) and Beaulieu Road (71.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 6,238 | 73.6% | 6.3% |
Operators with their own page for this station are linked to it.
Late train at Faygate? Delay Repay
These operators call at Faygate and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 480 | 73.1% | 4.4% |
| Period 6 of 2026-27 | 469 | 62.1% | 5.5% |
| Period 5 of 2026-27 | 480 | 68.1% | 9.8% |
| Period 4 of 2026-27 | 479 | 72.9% | 10.9% |
| Period 3 of 2026-27 | 470 | 73.3% | 7.7% |
| Period 2 of 2026-27 | 474 | 82.8% | 5.7% |
| Period 1 of 2026-27 | 548 | 83.3% | 7.3% |
| Period 13 of 2025-26 | 528 | 84.0% | 2.8% |
| Period 12 of 2025-26 | 476 | 74.5% | 3.8% |
| Period 11 of 2025-26 | 480 | 71.4% | 4.0% |
| Period 10 of 2025-26 | 394 | 75.5% | 5.3% |
| Period 9 of 2025-26 | 480 | 64.7% | 7.3% |
| Period 8 of 2025-26 | 480 | 68.7% | 6.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Tackley | 6,231 | 76.4% | 2.2% |
| Appleford | 6,381 | 76.1% | 4.5% |
| Beaulieu Road | 6,498 | 71.2% | 5.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out