Appleford
APFSouth EastManaged by Great Western Railway
How this station is performing
Appleford had 6,381 scheduled stops to Period 7 of 2026-27, about 18 a day. 76.1% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Appleford opened on 12 June 1844 and closed to passengers on 28 February 1849. It reopened on 11 September 1933, 93 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Cholsey is the oldest (1840) and Radley the newest (1856), with Appleford in between.
The nearest stations to Appleford are Culham (1.6 km north), Didcot Parkway (3.1 km south), Radley (5.1 km north), Cholsey (9.6 km south-east) and Oxford (12.8 km north). 4 stations lie within 10 km in all. Of the five, Cholsey is the most punctual at 78.9% and Didcot Parkway the least at 70.8%, with Appleford on 76.1%.
Appleford is named after Appleford-on-Thames, a Village, home to about 359 people, but the station stands 0.2 km from its centre.
Appleford has slipped a little, from 80.2% within three minutes in the previous 13 periods to 76.1% in the latest 13, a fall of 4.1 percentage points. Cancellations rose to 4.5% of scheduled stops from 3.5%, which is 1.0 percentage points more.
1 of 3 stations of a similar size in South East are more punctual than Appleford on 76.1%. The comparison group includes Beaulieu Road (71.2%), Faygate (73.6%) and Tackley (76.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 6,381 | 76.1% | 4.5% |
Operators with their own page for this station are linked to it.
Late train at Appleford? Delay Repay
These operators call at Appleford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 494 | 77.4% | 5.1% |
| Period 6 of 2026-27 | 494 | 71.2% | 4.3% |
| Period 5 of 2026-27 | 494 | 72.4% | 11.1% |
| Period 4 of 2026-27 | 494 | 67.2% | 5.5% |
| Period 3 of 2026-27 | 494 | 75.7% | 3.2% |
| Period 2 of 2026-27 | 494 | 76.4% | 3.8% |
| Period 1 of 2026-27 | 576 | 78.3% | 4.0% |
| Period 13 of 2025-26 | 536 | 84.5% | 3.9% |
| Period 12 of 2025-26 | 372 | 83.6% | 3.2% |
| Period 11 of 2025-26 | 496 | 82.1% | 4.4% |
| Period 10 of 2025-26 | 447 | 81.0% | 4.7% |
| Period 9 of 2025-26 | 496 | 68.4% | 1.6% |
| Period 8 of 2025-26 | 494 | 72.4% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Beaulieu Road | 6,498 | 71.2% | 5.3% |
| Faygate | 6,238 | 73.6% | 6.3% |
| Tackley | 6,231 | 76.4% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out