Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

LNER at Skipton

All trains at SkiptonLNER across BritainYorkshire and The Humber

On time, last 13 periods76.0%Whole station: 89.6%
Cancelled8.8%Whole station: 1.2%
Scheduled stops647Of 55,440 at the station

How this operator is doing here

LNER had 647 scheduled stops at Skipton in the 13 periods to Period 7 of 2026-27, 1% of the station's total. 76.0% of recorded arrivals came within three minutes and 8.8% of stops were cancelled.

LNER trains at Skipton also serve Keighley (13.0 km south-east, 68.2% on time, 8.8% cancelled), Shipley (Yorks) (21.6 km south-east, 81.7% on time, 5.7% cancelled), Bradford Forster Square (25.3 km south-east, 88.3% on time, 5.8% cancelled), Horsforth (28.7 km south-east, 73.1% on time, 6.2% cancelled), Harrogate (32.2 km east, 87.5% on time, 6.1% cancelled) and Leeds (36.2 km south-east, 70.1% on time, 3.8% cancelled), which are the stations on its network closest to Skipton.

Within 30 km of here, LNER runs best at Bradford Forster Square, 25.3 km south-east (88.3%), and worst at Horsforth, 28.7 km south-east (73.1%).

The busiest LNER station within 30 km of Skipton is Bradford Forster Square, 25.3 km south-east, with about 13 scheduled stops a day.

Of the 2 operators with enough records at Skipton, LNER is the least punctual, at 76.0%.

LNER cancels more at Skipton than elsewhere: 8.8% of scheduled stops, against 2.9% across its network and 1.2% for every operator at the station.

Alongside LNER, the other operators at Skipton are Northern (89.7%, 99% of stops), so passengers here can compare several services.

Period by period

70%75%80%85%90%2023-242024-252025-262026-27Period 13 of 2025-26: 77.4%Period 1 of 2026-27: 74.5%
This pageGreat Britain
0%5%10%15%Period 13 of 2025-26: 5.4%Period 1 of 2026-27: 12.1%2023-242024-252025-262026-27

See how LNER Delay Repay works

The last 13 periods

Other operators at Skipton

OperatorScheduled stopsWithin 3 minCancelled
Northern54,79389.7%1.1%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out