Northern at Skipton
All trains at SkiptonNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 54,793 scheduled stops at Skipton in the 13 periods to Period 7 of 2026-27, 99% of the station's total. 89.7% of recorded arrivals came within three minutes and 1.1% of stops were cancelled.
Northern trains at Skipton also serve Cononley (4.7 km south, 88.3% on time, 1.3% cancelled), Gargrave (5.6 km north-west, 79.1% on time, 0.9% cancelled), Steeton and Silsden (8.4 km south-east, 89.5% on time, 1.3% cancelled), Keighley (13.0 km south-east, 86.7% on time, 1.4% cancelled), Ilkley (13.9 km east, 92.0% on time, 1.3% cancelled) and Hellifield (14.4 km north-west, 78.2% on time, 0.9% cancelled), which are the stations on its network closest to Skipton.
Within 30 km of here, Northern runs best at Bradford Forster Square, 25.3 km south-east (93.3%), and worst at Sowerby Bridge, 28.9 km south (58.5%).
The busiest Northern station within 30 km of Skipton is Shipley (Yorks), 21.6 km south-east, with about 252 scheduled stops a day.
Of the 2 operators with enough records at Skipton, Northern is the most punctual, at 89.7%.
For Northern, Skipton is the 34th best of 493 ranked stations. Its 89.7% here is 11.1 percentage points above the 78.6% across the whole network.
Over three full railway years Northern at Skipton has improved each time, from 87.5% within three minutes in 2023-24 to 88.2% in 2024-25 and 89.4% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,176 | 90.3% | 0.7% |
| Period 6 of 2026-27 | 4,176 | 90.8% | 0.6% |
| Period 5 of 2026-27 | 4,169 | 91.6% | 0.9% |
| Period 4 of 2026-27 | 4,162 | 90.7% | 1.4% |
| Period 3 of 2026-27 | 4,158 | 90.3% | 2.0% |
| Period 2 of 2026-27 | 4,176 | 91.0% | 1.3% |
| Period 1 of 2026-27 | 4,767 | 91.7% | 1.0% |
| Period 13 of 2025-26 | 4,579 | 92.9% | 0.4% |
| Period 12 of 2025-26 | 4,176 | 92.3% | 0.7% |
| Period 11 of 2025-26 | 4,176 | 91.3% | 1.4% |
| Period 10 of 2025-26 | 3,738 | 87.3% | 1.4% |
| Period 9 of 2025-26 | 4,164 | 81.6% | 1.5% |
| Period 8 of 2025-26 | 4,176 | 83.6% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Skipton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 647 | 76.0% | 8.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out