Silver Street
SLVLondonManaged by London Overground
How this station is performing
Silver Street had 57,317 scheduled stops to Period 7 of 2026-27, about 158 a day. 94.6% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Silver Street opened on 22 July 1872, 154 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Silver Street is the newest; the oldest, Meridian Water, opened in 1840.
The nearest stations to Silver Street are Edmonton Green (1.1 km north), White Hart Lane (1.2 km south), Meridian Water (1.3 km south-east), Northumberland Park (1.8 km south-east) and Bruce Grove (2.4 km south). 75 stations lie within 10 km in all. Of the five, Meridian Water is the most punctual at 96.5% and Edmonton Green the least at 94.4%, with Silver Street on 94.6%.
In London, Silver Street ranks 20th of 332 ranked stations. Its 94.6% is 5.8 percentage points better than the area median of 88.8%.
London Overground is the only operator serving Silver Street. Here it manages 94.6% within three minutes, 5.2 percentage points better than its 89.4% across its whole network.
Compared with 3 stations of a similar size in London, Silver Street is the most punctual, at 94.6%. The comparison group includes Edmonton Green (94.4%), Lee (London) (87.6%) and London Fields (93.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 57,317 | 94.6% | 2.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,108 | 94.6% | 2.0% |
| Period 6 of 2026-27 | 4,042 | 93.5% | 2.4% |
| Period 5 of 2026-27 | 4,604 | 94.3% | 2.2% |
| Period 4 of 2026-27 | 3,807 | 92.2% | 2.8% |
| Period 3 of 2026-27 | 4,569 | 93.3% | 1.6% |
| Period 2 of 2026-27 | 4,558 | 96.1% | 0.4% |
| Period 1 of 2026-27 | 5,199 | 95.2% | 2.6% |
| Period 13 of 2025-26 | 4,413 | 95.9% | 1.3% |
| Period 12 of 2025-26 | 4,551 | 94.8% | 1.9% |
| Period 11 of 2025-26 | 4,614 | 96.7% | 0.6% |
| Period 10 of 2025-26 | 3,702 | 95.9% | 2.9% |
| Period 9 of 2025-26 | 4,536 | 93.8% | 2.0% |
| Period 8 of 2025-26 | 4,614 | 92.9% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Edmonton Green | 57,317 | 94.4% | 1.9% |
| Lee (London) | 57,270 | 87.6% | 1.4% |
| London Fields | 57,270 | 93.3% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out