London Fields
LOFLondonManaged by London Overground
How this station is performing
London Fields had 57,270 scheduled stops to Period 7 of 2026-27, about 157 a day. 93.3% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
London Fields opened on 27 May 1872, 154 years before the latest figures here, and has not been moved since. The First World War closed London Fields on 22 May 1916, and it reopened on 1 July 1919. Of the 5 stations nearest to it with a known opening date, London Fields is the newest; the oldest, Hackney Central, opened in 1850.
The nearest stations to London Fields are Hackney Central (0.6 km north), Hackney Downs (0.8 km north), Cambridge Heath (1.1 km south), Homerton (1.2 km north-east) and Dalston Junction (1.3 km west). 126 stations lie within 10 km in all. At 93.3%, London Fields is more punctual than every one of them; the best of the five, Cambridge Heath, manages 93.2%.
London Fields takes its name from an area of London called London Fields, and the station stands 0.2 km from its centre.
1 of 3 stations of a similar size in London are more punctual than London Fields on 93.3%. The comparison group includes Lee (London) (87.6%), Mottingham (89.1%) and Edmonton Green (94.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 57,270 | 93.3% | 2.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,104 | 93.0% | 2.6% |
| Period 6 of 2026-27 | 4,011 | 85.2% | 2.7% |
| Period 5 of 2026-27 | 4,598 | 89.3% | 2.2% |
| Period 4 of 2026-27 | 3,796 | 92.0% | 3.6% |
| Period 3 of 2026-27 | 4,545 | 92.1% | 2.1% |
| Period 2 of 2026-27 | 4,552 | 95.5% | 0.7% |
| Period 1 of 2026-27 | 5,194 | 94.8% | 3.1% |
| Period 13 of 2025-26 | 4,466 | 95.8% | 1.4% |
| Period 12 of 2025-26 | 4,545 | 94.6% | 2.1% |
| Period 11 of 2025-26 | 4,594 | 96.1% | 0.8% |
| Period 10 of 2025-26 | 4,085 | 95.5% | 2.6% |
| Period 9 of 2025-26 | 4,363 | 94.3% | 2.1% |
| Period 8 of 2025-26 | 4,417 | 93.7% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lee (London) | 57,270 | 87.6% | 1.4% |
| Mottingham | 57,270 | 89.1% | 1.5% |
| Edmonton Green | 57,317 | 94.4% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out