Edmonton Green
EDRLondonManaged by London Overground
How this station is performing
Edmonton Green had 57,317 scheduled stops to Period 7 of 2026-27, about 158 a day. 94.4% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Edmonton Green opened on 22 July 1872, 154 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Meridian Water is the oldest (1840) and Bush Hill Park the newest (1880), with Edmonton Green in between.
The nearest stations to Edmonton Green are Silver Street (1.1 km south), Meridian Water (1.8 km south-east), Bush Hill Park (2.0 km north), White Hart Lane (2.3 km south) and Northumberland Park (2.6 km south). 68 stations lie within 10 km in all. Of the five, Meridian Water is the most punctual at 96.5% and Bush Hill Park the least at 93.3%, with Edmonton Green on 94.4%.
Edmonton Green is named after Edmonton, an area of London, home to about 80,546 people, but the station stands 1.2 km from its centre.
1 of 3 stations of a similar size in London are more punctual than Edmonton Green on 94.4%. The comparison group includes Silver Street (94.6%), Lee (London) (87.6%) and London Fields (93.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 57,317 | 94.4% | 1.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,108 | 94.4% | 1.9% |
| Period 6 of 2026-27 | 4,044 | 93.5% | 2.3% |
| Period 5 of 2026-27 | 4,604 | 94.1% | 2.2% |
| Period 4 of 2026-27 | 3,805 | 92.2% | 2.9% |
| Period 3 of 2026-27 | 4,569 | 93.1% | 1.5% |
| Period 2 of 2026-27 | 4,558 | 95.9% | 0.3% |
| Period 1 of 2026-27 | 5,199 | 94.9% | 2.4% |
| Period 13 of 2025-26 | 4,413 | 95.8% | 1.1% |
| Period 12 of 2025-26 | 4,551 | 94.7% | 1.7% |
| Period 11 of 2025-26 | 4,614 | 96.6% | 0.7% |
| Period 10 of 2025-26 | 3,702 | 95.7% | 2.9% |
| Period 9 of 2025-26 | 4,536 | 93.8% | 1.9% |
| Period 8 of 2025-26 | 4,614 | 92.7% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Silver Street | 57,317 | 94.6% | 2.0% |
| Lee (London) | 57,270 | 87.6% | 1.4% |
| London Fields | 57,270 | 93.3% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out