How this operator is doing here
Southeastern had 44,651 scheduled stops at Shortlands in the 13 periods to Period 7 of 2026-27, 57% of the station's total. 84.7% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.
Southeastern trains at Shortlands also serve Bromley North (1.1 km east, 99.2% on time, 0.5% cancelled), Bromley South (1.3 km south-east, 80.6% on time, 1.6% cancelled), Sundridge Park (1.6 km north-east, 99.4% on time, 0.5% cancelled), Beckenham Junction (2.0 km west, 84.4% on time, 2.3% cancelled), Eden Park (2.6 km south-west, 94.6% on time, 1.4% cancelled) and New Beckenham (2.9 km north-west, 93.5% on time, 1.1% cancelled), which are the stations on its network closest to Shortlands.
Within 30 km of here, Southeastern runs best at Sundridge Park, 1.6 km north-east (99.4%), and worst at Hildenborough, 26.4 km south-east (70.3%).
The busiest Southeastern station within 30 km of Shortlands is London Bridge, 12.6 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Shortlands, Southeastern is the least punctual, at 84.7%.
For Southeastern, Shortlands ranks 72nd of 173 stations and is typical: 84.7% here against 84.2% across the network, a difference of 0.5 percentage points.
Over three full railway years Southeastern at Shortlands has got worse each time, from 87.2% within three minutes in 2023-24 to 86.9% in 2024-25 and 85.3% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,565 | 85.6% | 1.5% |
| Period 6 of 2026-27 | 3,480 | 81.7% | 2.8% |
| Period 5 of 2026-27 | 2,514 | 78.6% | 2.3% |
| Period 4 of 2026-27 | 3,566 | 86.5% | 2.3% |
| Period 3 of 2026-27 | 3,517 | 82.9% | 3.0% |
| Period 2 of 2026-27 | 3,357 | 85.8% | 3.4% |
| Period 1 of 2026-27 | 3,941 | 90.5% | 1.3% |
| Period 13 of 2025-26 | 3,924 | 88.9% | 1.4% |
| Period 12 of 2025-26 | 3,496 | 87.9% | 1.5% |
| Period 11 of 2025-26 | 3,558 | 86.1% | 1.6% |
| Period 10 of 2025-26 | 2,683 | 81.9% | 4.4% |
| Period 9 of 2025-26 | 3,567 | 81.9% | 2.4% |
| Period 8 of 2025-26 | 3,483 | 78.7% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Shortlands
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 33,461 | 89.8% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out