Shortlands
SRTLondonManaged by Southeastern
How this station is performing
Shortlands had 78,112 scheduled stops to Period 7 of 2026-27, about 215 a day. 86.9% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Shortlands opened on 3 May 1858, 168 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Beckenham Junction is the oldest (1857) and Ravensbourne the newest (1892), with Shortlands in between.
The nearest stations to Shortlands are Bromley North (1.1 km east), Ravensbourne (1.2 km north-west), Bromley South (1.3 km south-east), Sundridge Park (1.6 km north-east) and Beckenham Junction (2.0 km west). 83 stations lie within 10 km in all. Of the five, Sundridge Park is the most punctual at 99.4% and Bromley South the least at 82.4%, with Shortlands on 86.9%.
Shortlands takes its name from a Village called Shortlands, home to about 9,303 people, and the station stands 0.9 km from its centre.
2 operators call at Shortlands: Southeastern (84.7%, 57% of stops) and GTR (89.8%, 43% of stops). The operator you travel with matters: GTR reaches 89.8% within three minutes while Southeastern manages 84.7%, a gap of 5.1 percentage points.
2 of 3 stations of a similar size in London are more punctual than Shortlands on 86.9%. The comparison group includes Bickley (85.8%), Woolwich Arsenal (88.2%) and Charlton (87.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 44,651 | 84.7% | 2.3% |
| GTR | 33,461 | 89.8% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Shortlands? Delay Repay
These operators call at Shortlands and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,193 | 86.3% | 1.8% |
| Period 6 of 2026-27 | 6,048 | 83.4% | 3.6% |
| Period 5 of 2026-27 | 5,142 | 83.8% | 2.7% |
| Period 4 of 2026-27 | 6,190 | 88.0% | 2.8% |
| Period 3 of 2026-27 | 5,948 | 85.9% | 3.7% |
| Period 2 of 2026-27 | 5,713 | 87.9% | 3.9% |
| Period 1 of 2026-27 | 6,822 | 92.3% | 1.3% |
| Period 13 of 2025-26 | 6,786 | 90.5% | 2.2% |
| Period 12 of 2025-26 | 6,056 | 89.7% | 2.0% |
| Period 11 of 2025-26 | 6,154 | 88.2% | 2.1% |
| Period 10 of 2025-26 | 4,821 | 85.8% | 4.9% |
| Period 9 of 2025-26 | 6,195 | 83.6% | 4.0% |
| Period 8 of 2025-26 | 6,044 | 82.2% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bickley | 78,012 | 85.8% | 2.6% |
| Woolwich Arsenal | 78,335 | 88.2% | 3.0% |
| Charlton | 78,340 | 87.1% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out