GTR had 33,461 scheduled stops at Shortlands in the 13 periods to Period 7 of 2026-27, 43% of the station's total. 89.8% of recorded arrivals came within three minutes and 3.6% of stops were cancelled.
GTR trains at Shortlands also serve Ravensbourne (1.2 km north-west, 91.3% on time, 4.0% cancelled), Bromley South (1.3 km south-east, 87.8% on time, 3.2% cancelled), Beckenham Junction (2.0 km west, 98.1% on time, 3.1% cancelled), Beckenham Hill (2.5 km north-west, 90.6% on time, 4.1% cancelled), Bickley (3.0 km east, 87.4% on time, 3.4% cancelled) and Bellingham (3.4 km north-west, 89.4% on time, 4.0% cancelled), which are the stations on its network closest to Shortlands.
Within 30 km of here, GTR runs best at Beckenham Junction, 2.0 km west (98.1%), and worst at Kenley, 11.5 km south-west (66.9%).
The busiest GTR station within 30 km of Shortlands is East Croydon, 7.4 km south-west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Shortlands, GTR is the most punctual, at 89.8%.
For GTR, Shortlands is the 64th best of 307 ranked stations. Its 89.8% here is 6.9 percentage points above the 82.9% across the whole network.
Cancellations of GTR at Shortlands are near its usual level: 3.6% of scheduled stops, against 4.7% across its network and 2.9% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,628 | 87.3% | 2.2% |
| Period 6 of 2026-27 | 2,568 | 85.6% | 4.7% |
| Period 5 of 2026-27 | 2,628 | 88.8% | 3.1% |
| Period 4 of 2026-27 | 2,624 | 90.0% | 3.5% |
| Period 3 of 2026-27 | 2,431 | 90.2% | 4.7% |
| Period 2 of 2026-27 | 2,356 | 91.1% | 4.6% |
| Period 1 of 2026-27 | 2,881 | 94.7% | 1.1% |
| Period 13 of 2025-26 | 2,862 | 92.7% | 3.2% |
| Period 12 of 2025-26 | 2,560 | 92.2% | 2.7% |
| Period 11 of 2025-26 | 2,596 | 91.0% | 2.7% |
| Period 10 of 2025-26 | 2,138 | 90.7% | 5.6% |
| Period 9 of 2025-26 | 2,628 | 85.9% | 6.1% |
| Period 8 of 2025-26 | 2,561 | 86.9% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Shortlands
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 44,651 | 84.7% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out