Shoreditch High Street
SDCLondonManaged by London Overground
How this station is performing
Shoreditch High Street had 209,634 scheduled stops to Period 7 of 2026-27, about 576 a day. 92.0% of recorded arrivals were within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Shoreditch High Street opened on 10 April 1876 and closed to passengers on 11 June 2006. It reopened on 23 May 2010, 16 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Bethnal Green is the oldest (1872) and Hoxton the newest (2010), with Shoreditch High Street in between.
The nearest stations to Shoreditch High Street are London Liverpool Street (0.7 km south-west), Hoxton (0.9 km north), Old Street (0.9 km west), Bethnal Green (1.0 km east) and Whitechapel (1.1 km east). 135 stations lie within 10 km in all. At 92.0%, Shoreditch High Street is more punctual than every one of them; the best of the five, Hoxton, manages 91.9%.
Shoreditch High Street is named after Shoreditch, an area of London, but the station stands 0.4 km from its centre.
Compared with 3 stations of a similar size in London, Shoreditch High Street is the most punctual, at 92.0%. The comparison group includes Haggerston (91.4%), Hoxton (91.9%) and Rotherhithe (91.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 209,634 | 92.0% | 3.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 16,192 | 89.3% | 2.6% |
| Period 6 of 2026-27 | 15,449 | 89.1% | 5.3% |
| Period 5 of 2026-27 | 15,600 | 90.6% | 10.6% |
| Period 4 of 2026-27 | 16,089 | 92.5% | 5.3% |
| Period 3 of 2026-27 | 16,340 | 92.3% | 2.9% |
| Period 2 of 2026-27 | 15,854 | 93.0% | 4.0% |
| Period 1 of 2026-27 | 18,739 | 93.1% | 3.5% |
| Period 13 of 2025-26 | 16,629 | 94.5% | 2.8% |
| Period 12 of 2025-26 | 16,120 | 94.0% | 2.9% |
| Period 11 of 2025-26 | 16,259 | 92.2% | 3.1% |
| Period 10 of 2025-26 | 14,481 | 93.4% | 2.0% |
| Period 9 of 2025-26 | 16,093 | 90.2% | 2.8% |
| Period 8 of 2025-26 | 15,789 | 91.4% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Haggerston | 209,634 | 91.4% | 3.9% |
| Hoxton | 209,634 | 91.9% | 3.9% |
| Rotherhithe | 209,634 | 91.1% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out