Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Sholing

All trains at SholingGTR across BritainSouth East

On time, last 13 periods–Whole station: 77.8%
Cancelled–Whole station: 1.6%
Scheduled stops2Of 12,952 at the station

How this operator is doing here

There are not enough usable records of GTR at Sholing to report how punctual it is.

Period by period

75%80%85%90%2023-242024-252025-262026-27
This pageGreat Britain
0%2%4%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

Other operators at Sholing

OperatorScheduled stopsWithin 3 minCancelled
South Western Railway12,95077.8%1.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out