Shepreth
STHEast of EnglandManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Shepreth had 18,862 scheduled stops to Period 7 of 2026-27, about 52 a day. 69.8% of recorded arrivals were within three minutes of the timetable and 5.1% of scheduled stops were cancelled.
Shepreth opened on 1 August 1851, 175 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Shelford (Cambs) is the oldest (1845) and Foxton the newest (1852), with Shepreth in between.
The nearest stations to Shepreth are Foxton (1.8 km east), Meldreth (3.1 km south-west), Royston (7.9 km south-west), Shelford (Cambs) (8.4 km north-east) and Whittlesford Parkway (9.2 km east). 5 stations lie within 10 km in all. Of the five, Shelford (Cambs) is the most punctual at 87.7% and Foxton the least at 66.8%, with Shepreth on 69.8%.
Shepreth takes its name from a Village called Shepreth, home to about 819 people, and the station stands 0.3 km from its centre.
Shepreth has slipped sharply. 69.8% of stops came within three minutes of the timetable in the latest 13 periods, 5.8 percentage points worse than the 75.6% recorded in the 13 before. Cancellations fell to 5.1% of scheduled stops from 5.7%, which is 0.6 percentage points fewer.
Compared with 3 stations of a similar size in East of England, Shepreth is the most punctual, at 69.8%. The comparison group includes Meldreth (68.4%), Foxton (66.8%) and March (67.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 18,862 | 69.8% | 5.1% |
Operators with their own page for this station are linked to it.
Late train at Shepreth? Delay Repay
These operators call at Shepreth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,500 | 56.4% | 4.3% |
| Period 6 of 2026-27 | 1,482 | 59.4% | 7.8% |
| Period 5 of 2026-27 | 1,493 | 64.9% | 4.8% |
| Period 4 of 2026-27 | 1,480 | 54.7% | 8.6% |
| Period 3 of 2026-27 | 1,470 | 75.2% | 6.9% |
| Period 2 of 2026-27 | 1,463 | 75.8% | 6.2% |
| Period 1 of 2026-27 | 1,673 | 77.0% | 4.2% |
| Period 13 of 2025-26 | 1,660 | 76.5% | 3.3% |
| Period 12 of 2025-26 | 1,510 | 77.7% | 2.2% |
| Period 11 of 2025-26 | 1,419 | 73.1% | 2.8% |
| Period 10 of 2025-26 | 887 | 72.5% | 3.5% |
| Period 9 of 2025-26 | 1,378 | 70.8% | 7.5% |
| Period 8 of 2025-26 | 1,447 | 72.5% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out