Foxton
FXNEast of EnglandManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Foxton had 18,869 scheduled stops to Period 7 of 2026-27, about 52 a day. 66.8% of recorded arrivals were within three minutes of the timetable and 5.1% of scheduled stops were cancelled.
Foxton opened on 1 April 1852, 174 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Foxton is the newest; the oldest, Shelford (Cambs), opened in 1845.
The nearest stations to Foxton are Shepreth (1.8 km west), Meldreth (4.6 km south-west), Shelford (Cambs) (6.6 km north-east), Whittlesford Parkway (7.7 km east) and Royston (9.3 km south-west). 5 stations lie within 10 km in all. At 66.8%, Foxton is less punctual than all of them; the best of the five, Shelford (Cambs), manages 87.7%.
Foxton is one of 5 stations named after a Village called Foxton, home to about 3,420 people; this one stands 0.5 km from its centre.
Foxton has slipped sharply. 66.8% of stops came within three minutes of the timetable in the latest 13 periods, 5.6 percentage points worse than the 72.4% recorded in the 13 before. Cancellations fell to 5.1% of scheduled stops from 5.7%, which is 0.6 percentage points fewer.
Compared with 3 stations of a similar size in East of England, Foxton is the least punctual, at 66.8%. All of them are ahead, including Meldreth (68.4%), Shepreth (69.8%) and March (67.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 18,869 | 66.8% | 5.1% |
Operators with their own page for this station are linked to it.
Late train at Foxton? Delay Repay
These operators call at Foxton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,500 | 55.6% | 4.3% |
| Period 6 of 2026-27 | 1,483 | 59.0% | 7.8% |
| Period 5 of 2026-27 | 1,493 | 63.4% | 4.8% |
| Period 4 of 2026-27 | 1,480 | 54.0% | 8.6% |
| Period 3 of 2026-27 | 1,470 | 70.8% | 6.9% |
| Period 2 of 2026-27 | 1,463 | 70.9% | 6.2% |
| Period 1 of 2026-27 | 1,675 | 71.7% | 4.2% |
| Period 13 of 2025-26 | 1,660 | 72.2% | 3.3% |
| Period 12 of 2025-26 | 1,510 | 74.2% | 2.3% |
| Period 11 of 2025-26 | 1,419 | 69.7% | 2.8% |
| Period 10 of 2025-26 | 887 | 70.6% | 3.5% |
| Period 9 of 2025-26 | 1,379 | 67.1% | 7.4% |
| Period 8 of 2025-26 | 1,450 | 68.5% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out