Meldreth
MELEast of EnglandManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Meldreth had 18,862 scheduled stops to Period 7 of 2026-27, about 52 a day. 68.4% of recorded arrivals were within three minutes of the timetable and 5.1% of scheduled stops were cancelled.
Meldreth opened on 1 August 1851, 175 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Whittlesford Parkway is the oldest (1845) and Foxton the newest (1852), with Meldreth in between.
The nearest stations to Meldreth are Shepreth (3.1 km north-east), Foxton (4.6 km north-east), Royston (4.8 km south-west), Ashwell and Morden (10.5 km south-west) and Whittlesford Parkway (10.8 km east). 3 stations lie within 10 km in all. Of the five, Whittlesford Parkway is the most punctual at 86.2% and Foxton the least at 66.8%, with Meldreth on 68.4%.
Meldreth takes its name from a Village called Meldreth, home to about 2,027 people, and the station stands 1.2 km from its centre.
For Meldreth, the weakest four-week period in the data is a recent one: Period 4 of 2026-27, when only 54.2% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2024-25, at 79.0%, which is 24.8 percentage points higher. Cancellations peaked at 13.3% of scheduled stops in Period 10 of 2024-25, against 5.1% over the latest 13 periods.
1 of 3 stations of a similar size in East of England are more punctual than Meldreth on 68.4%. The comparison group includes Shepreth (69.8%), Foxton (66.8%) and March (67.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 18,862 | 68.4% | 5.1% |
Operators with their own page for this station are linked to it.
Late train at Meldreth? Delay Repay
These operators call at Meldreth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,500 | 58.2% | 4.2% |
| Period 6 of 2026-27 | 1,482 | 59.9% | 7.8% |
| Period 5 of 2026-27 | 1,493 | 65.1% | 4.8% |
| Period 4 of 2026-27 | 1,480 | 54.2% | 8.6% |
| Period 3 of 2026-27 | 1,470 | 73.8% | 6.9% |
| Period 2 of 2026-27 | 1,463 | 73.7% | 6.2% |
| Period 1 of 2026-27 | 1,673 | 74.6% | 4.2% |
| Period 13 of 2025-26 | 1,660 | 74.9% | 3.3% |
| Period 12 of 2025-26 | 1,510 | 75.7% | 2.2% |
| Period 11 of 2025-26 | 1,419 | 72.7% | 2.8% |
| Period 10 of 2025-26 | 887 | 69.8% | 3.5% |
| Period 9 of 2025-26 | 1,378 | 66.4% | 7.5% |
| Period 8 of 2025-26 | 1,447 | 67.7% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out