How this station is performing
Shepherds Well had 16,564 scheduled stops to Period 7 of 2026-27, about 46 a day. 73.1% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Shepherds Well opened on 22 July 1861, 165 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Shepherds Well is the oldest; the next oldest, Adisham, dates from 1861.
The nearest stations to Shepherds Well are Snowdown (3.2 km north), Aylesham (4.5 km north), Kearsney (Kent) (5.2 km south-east), Adisham (6.3 km north) and Martin Mill (8.5 km east). 6 stations lie within 10 km in all. At 73.1%, Shepherds Well is less punctual than all of them; the best of the five, Snowdown, manages 86.7%.
Shepherds Well is named after Shepherdswell, a Village, home to about 1,630 people, but the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Shepherds Well was Period 9 of 2024-25, at 48.1%, some time before the latest year. The strongest was Period 1 of 2025-26, at 81.5%, and the two are 33.4 percentage points apart. Cancellations peaked at 5.1% of scheduled stops in Period 4 of 2025-26, against 1.8% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Shepherds Well is the least punctual, at 73.1%. All of them are ahead, including Chartham (80.9%), Chilham (80.3%) and Kearsney (Kent) (75.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 16,564 | 73.1% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Shepherds Well? Delay Repay
These operators call at Shepherds Well and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,271 | 75.0% | 1.4% |
| Period 6 of 2026-27 | 1,281 | 71.8% | 2.0% |
| Period 5 of 2026-27 | 1,297 | 68.0% | 1.6% |
| Period 4 of 2026-27 | 1,267 | 74.1% | 1.7% |
| Period 3 of 2026-27 | 1,298 | 68.8% | 2.5% |
| Period 2 of 2026-27 | 1,241 | 71.6% | 1.6% |
| Period 1 of 2026-27 | 1,322 | 80.4% | 1.7% |
| Period 13 of 2025-26 | 1,435 | 77.2% | 2.2% |
| Period 12 of 2025-26 | 1,264 | 77.3% | 1.1% |
| Period 11 of 2025-26 | 1,306 | 79.4% | 1.6% |
| Period 10 of 2025-26 | 1,046 | 62.7% | 2.0% |
| Period 9 of 2025-26 | 1,297 | 69.7% | 2.6% |
| Period 8 of 2025-26 | 1,239 | 71.0% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chartham | 16,565 | 80.9% | 1.0% |
| Chilham | 16,565 | 80.3% | 1.0% |
| Kearsney (Kent) | 16,563 | 75.7% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out