Kearsney (Kent)
KSNSouth EastManaged by Southeastern
How this station is performing
Kearsney (Kent) had 16,563 scheduled stops to Period 7 of 2026-27, about 46 a day. 75.7% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Kearsney (Kent) opened on 1 August 1862, 164 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Dover Priory is the oldest (1861) and Aylesham the newest (1928), with Kearsney (Kent) in between.
The nearest stations to Kearsney (Kent) are Dover Priory (3.5 km south-east), Shepherds Well (5.2 km north-west), Martin Mill (5.8 km north-east), Snowdown (8.3 km north-west) and Aylesham (9.7 km north-west). 6 stations lie within 10 km in all. Of the five, Snowdown is the most punctual at 86.7% and Shepherds Well the least at 73.1%, with Kearsney (Kent) on 75.7%.
Kearsney (Kent) is named after Kearsney, a Village, but the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Kearsney (Kent) was Period 9 of 2023-24, at 51.4%, some time before the latest year. The strongest was Period 1 of 2025-26, at 83.9%, and the two are 32.5 percentage points apart. Cancellations peaked at 5.3% of scheduled stops in Period 4 of 2025-26, against 1.9% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Kearsney (Kent) on 75.7%. The comparison group includes Shepherds Well (73.1%), Chartham (80.9%) and Chilham (80.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 16,563 | 75.7% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Kearsney (Kent)? Delay Repay
These operators call at Kearsney (Kent) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,271 | 78.4% | 1.4% |
| Period 6 of 2026-27 | 1,281 | 75.2% | 2.0% |
| Period 5 of 2026-27 | 1,297 | 70.8% | 1.7% |
| Period 4 of 2026-27 | 1,267 | 77.6% | 1.7% |
| Period 3 of 2026-27 | 1,297 | 70.9% | 2.6% |
| Period 2 of 2026-27 | 1,241 | 74.1% | 1.6% |
| Period 1 of 2026-27 | 1,322 | 83.0% | 1.8% |
| Period 13 of 2025-26 | 1,435 | 79.6% | 2.2% |
| Period 12 of 2025-26 | 1,264 | 79.9% | 1.3% |
| Period 11 of 2025-26 | 1,306 | 82.0% | 1.8% |
| Period 10 of 2025-26 | 1,046 | 66.3% | 2.0% |
| Period 9 of 2025-26 | 1,297 | 71.4% | 3.2% |
| Period 8 of 2025-26 | 1,239 | 72.3% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Shepherds Well | 16,564 | 73.1% | 1.8% |
| Chartham | 16,565 | 80.9% | 1.0% |
| Chilham | 16,565 | 80.3% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out