Chartham
CRTSouth EastManaged by Southeastern
How this station is performing
Chartham had 16,565 scheduled stops to Period 7 of 2026-27, about 46 a day. 80.9% of recorded arrivals were within three minutes of the timetable and 1.0% of scheduled stops were cancelled.
Chartham opened on 1 November 1859, 167 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Chilham is the oldest (1846) and Bekesbourne the newest (1861), with Chartham in between.
The nearest stations to Chartham are Chilham (3.3 km south-west), Canterbury East (4.4 km north-east), Canterbury West (5.0 km north-east), Selling (5.8 km north-west) and Bekesbourne (8.3 km east). 6 stations lie within 10 km in all. At 80.9%, Chartham is more punctual than every one of them; the best of the five, Chilham, manages 80.3%.
Chartham takes its name from a Village called Chartham, home to about 4,753 people, and the station stands 0.3 km from its centre.
For Chartham, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 61.6% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2026-27, at 90.4%, which is 28.8 percentage points higher.
Compared with 3 stations of a similar size in South East, Chartham is the most punctual, at 80.9%. The comparison group includes Chilham (80.3%), Shepherds Well (73.1%) and Kearsney (Kent) (75.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 16,565 | 80.9% | 1.0% |
Operators with their own page for this station are linked to it.
Late train at Chartham? Delay Repay
These operators call at Chartham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,285 | 67.4% | 1.0% |
| Period 6 of 2026-27 | 1,273 | 61.6% | 1.3% |
| Period 5 of 2026-27 | 1,285 | 73.9% | 0.5% |
| Period 4 of 2026-27 | 1,284 | 86.7% | 1.0% |
| Period 3 of 2026-27 | 1,225 | 84.0% | 1.2% |
| Period 2 of 2026-27 | 1,260 | 84.7% | 1.7% |
| Period 1 of 2026-27 | 1,449 | 90.4% | 0.5% |
| Period 13 of 2025-26 | 1,387 | 87.9% | 0.7% |
| Period 12 of 2025-26 | 1,254 | 86.9% | 0.7% |
| Period 11 of 2025-26 | 1,284 | 87.6% | 1.2% |
| Period 10 of 2025-26 | 1,073 | 83.9% | 0.9% |
| Period 9 of 2025-26 | 1,222 | 75.8% | 1.6% |
| Period 8 of 2025-26 | 1,284 | 78.8% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chilham | 16,565 | 80.3% | 1.0% |
| Shepherds Well | 16,564 | 73.1% | 1.8% |
| Kearsney (Kent) | 16,563 | 75.7% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out