CrossCountry at Severn Tunnel Junction
All trains at Severn Tunnel JunctionCrossCountry across BritainWales
How this operator is doing here
CrossCountry had 1,762 scheduled stops at Severn Tunnel Junction in the 13 periods to Period 7 of 2026-27, 6% of the station's total. 78.8% of recorded arrivals came within three minutes and 16.1% of stops were cancelled.
CrossCountry trains at Severn Tunnel Junction also serve Caldicot (1.2 km east, 80.4% on time, 16.1% cancelled), Chepstow (9.6 km north-east, 77.6% on time, 11.8% cancelled), Newport (South Wales) (15.4 km west, 72.1% on time, 15.5% cancelled), Bristol Parkway (18.0 km south-east, 59.0% on time, 4.7% cancelled), Bristol Temple Meads (20.3 km south-east, 57.7% on time, 5.7% cancelled) and Lydney (22.3 km north-east, 74.7% on time, 13.3% cancelled), which are the stations on its network closest to Severn Tunnel Junction.
Within 30 km of here, CrossCountry runs best at Chepstow, 9.6 km north-east (77.6%), and worst at Bristol Temple Meads, 20.3 km south-east (57.7%).
The busiest CrossCountry station within 30 km of Severn Tunnel Junction is Bristol Temple Meads, 20.3 km south-east, with about 58 scheduled stops a day.
CrossCountry at Severn Tunnel Junction has slipped a little, from 83.7% within three minutes in the previous 13 periods to 78.8% in the latest 13, a fall of 4.9 percentage points. Cancellations rose to 16.1% of scheduled stops from 12.8%, which is 3.3 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 125 | 65.7% | 20.8% |
| Period 6 of 2026-27 | 140 | 79.0% | 28.6% |
| Period 5 of 2026-27 | 109 | 80.6% | 14.7% |
| Period 4 of 2026-27 | 140 | 80.6% | 11.4% |
| Period 3 of 2026-27 | 122 | 86.3% | 16.4% |
| Period 2 of 2026-27 | 140 | 79.6% | 26.4% |
| Period 1 of 2026-27 | 163 | 81.7% | 6.1% |
| Period 13 of 2025-26 | 152 | 71.3% | 10.5% |
| Period 12 of 2025-26 | 140 | 80.8% | 7.1% |
| Period 11 of 2025-26 | 135 | 81.5% | 8.1% |
| Period 10 of 2025-26 | 119 | 77.3% | 26.1% |
| Period 9 of 2025-26 | 142 | 73.1% | 23.9% |
| Period 8 of 2025-26 | 135 | 84.9% | 11.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Severn Tunnel Junction
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 17,456 | 74.4% | 3.9% |
| Transport for Wales | 10,660 | 70.5% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out