Great Western Railway at Severn Tunnel Junction
All trains at Severn Tunnel JunctionGreat Western Railway across BritainWales
How this operator is doing here
Great Western Railway had 17,456 scheduled stops at Severn Tunnel Junction in the 13 periods to Period 7 of 2026-27, 58% of the station's total. 74.4% of recorded arrivals came within three minutes and 3.9% of stops were cancelled.
Great Western Railway trains at Severn Tunnel Junction also serve Severn Beach (8.3 km east, 79.1% on time, 4.0% cancelled), St Andrews Road (9.7 km south-east, 78.6% on time, 4.0% cancelled), Pilning (10.8 km east, – on time, – cancelled), Avonmouth (10.9 km south-east, 74.6% on time, 4.2% cancelled), Portway Park and Ride (12.4 km south-east, 68.7% on time, 3.9% cancelled) and Shirehampton (13.0 km south-east, 69.3% on time, 4.0% cancelled), which are the stations on its network closest to Severn Tunnel Junction.
Within 30 km of here, Great Western Railway runs best at Ashley Down, 18.2 km south-east (84.7%), and worst at Newport (South Wales), 15.4 km west (66.4%).
The busiest Great Western Railway station within 30 km of Severn Tunnel Junction is Bristol Temple Meads, 20.3 km south-east, with about 333 scheduled stops a day.
Great Western Railway ranks 2nd of the 3 operators with enough records at Severn Tunnel Junction, on 74.4%.
Over three full railway years Great Western Railway at Severn Tunnel Junction has improved each time, from 68.2% within three minutes in 2023-24 to 73.1% in 2024-25 and 75.9% in 2025-26.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,400 | 72.1% | 2.6% |
| Period 6 of 2026-27 | 1,400 | 71.8% | 4.4% |
| Period 5 of 2026-27 | 1,305 | 64.3% | 7.4% |
| Period 4 of 2026-27 | 1,400 | 74.5% | 4.9% |
| Period 3 of 2026-27 | 960 | 73.6% | 9.6% |
| Period 2 of 2026-27 | 1,005 | 80.6% | 1.4% |
| Period 1 of 2026-27 | 1,612 | 77.7% | 3.0% |
| Period 13 of 2025-26 | 1,528 | 78.1% | 1.8% |
| Period 12 of 2025-26 | 1,400 | 82.2% | 1.5% |
| Period 11 of 2025-26 | 1,400 | 81.1% | 2.3% |
| Period 10 of 2025-26 | 1,262 | 73.8% | 4.9% |
| Period 9 of 2025-26 | 1,397 | 65.2% | 5.5% |
| Period 8 of 2025-26 | 1,387 | 71.6% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Severn Tunnel Junction
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 10,660 | 70.5% | 3.4% |
| CrossCountry | 1,762 | 78.8% | 16.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out