Transport for Wales at Severn Tunnel Junction
All trains at Severn Tunnel JunctionTransport for Wales across BritainWales
How this operator is doing here
Transport for Wales had 10,660 scheduled stops at Severn Tunnel Junction in the 13 periods to Period 7 of 2026-27, 36% of the station's total. 70.5% of recorded arrivals came within three minutes and 3.4% of stops were cancelled.
Transport for Wales trains at Severn Tunnel Junction also serve Caldicot (1.2 km east, 69.5% on time, 3.4% cancelled), Chepstow (9.6 km north-east, 68.6% on time, 3.5% cancelled), Newport (South Wales) (15.4 km west, 77.1% on time, 3.4% cancelled), Pye Corner (18.2 km west, 88.2% on time, 3.8% cancelled), Cwmbran (18.4 km north-west, 68.2% on time, 3.1% cancelled) and Rogerstone (20.0 km west, 87.1% on time, 3.8% cancelled), which are the stations on its network closest to Severn Tunnel Junction.
Within 30 km of here, Transport for Wales runs best at Cardiff Bay, 29.9 km south-west (95.7%), and worst at Lydney, 22.3 km north-east (65.8%).
The busiest Transport for Wales station within 30 km of Severn Tunnel Junction is Cardiff Queen Street, 29.5 km south-west, with about 462 scheduled stops a day.
Of the 3 operators with enough records at Severn Tunnel Junction, Transport for Wales is the least punctual, at 70.5%.
Over three full railway years Transport for Wales at Severn Tunnel Junction has improved each time, from 65.8% within three minutes in 2023-24 to 70.4% in 2024-25 and 72.5% in 2025-26.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 838 | 65.6% | 3.3% |
| Period 6 of 2026-27 | 751 | 66.3% | 5.5% |
| Period 5 of 2026-27 | 694 | 66.1% | 13.3% |
| Period 4 of 2026-27 | 711 | 68.1% | 5.6% |
| Period 3 of 2026-27 | 839 | 73.5% | 2.0% |
| Period 2 of 2026-27 | 836 | 66.6% | 3.3% |
| Period 1 of 2026-27 | 965 | 75.2% | 1.2% |
| Period 13 of 2025-26 | 915 | 75.9% | 1.0% |
| Period 12 of 2025-26 | 837 | 76.4% | 1.7% |
| Period 11 of 2025-26 | 836 | 81.3% | 1.9% |
| Period 10 of 2025-26 | 763 | 66.4% | 2.8% |
| Period 9 of 2025-26 | 839 | 61.8% | 4.4% |
| Period 8 of 2025-26 | 836 | 69.1% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Severn Tunnel Junction
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 17,456 | 74.4% | 3.9% |
| CrossCountry | 1,762 | 78.8% | 16.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out