Scotstounhill
SCHScotlandManaged by ScotRail
How this station is performing
Scotstounhill had 45,649 scheduled stops to Period 7 of 2026-27, about 125 a day. 87.7% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Scotstounhill opened on 1 December 1882, 144 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Anniesland is the oldest (1874) and Garscadden the newest (1960), with Scotstounhill in between.
The nearest stations to Scotstounhill are Garscadden (0.8 km north-west), Jordanhill (1.8 km east), Anniesland (2.0 km east), Drumchapel (2.3 km north) and Yoker (2.3 km west). 69 stations lie within 10 km in all. Of the five, Jordanhill is the most punctual at 88.5% and Garscadden the least at 87.2%, with Scotstounhill on 87.7%.
Across the whole run of data, the weakest four-week period for Scotstounhill was Period 8 of 2024-25, at 80.5%, some time before the latest year. The strongest was Period 3 of 2024-25, at 93.6%, and the two are 13.1 percentage points apart. Cancellations peaked at 6.9% of scheduled stops in Period 7 of 2023-24, against 2.2% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Scotstounhill is the least punctual, at 87.7%. All of them are ahead, including Jordanhill (88.5%), Port Glasgow (96.4%) and Bishopton (Renfrewshire) (96.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 45,649 | 87.7% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at Scotstounhill? Delay Repay
These operators call at Scotstounhill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,484 | 85.3% | 3.0% |
| Period 6 of 2026-27 | 3,484 | 88.5% | 1.5% |
| Period 5 of 2026-27 | 3,501 | 87.9% | 1.5% |
| Period 4 of 2026-27 | 3,463 | 88.8% | 4.4% |
| Period 3 of 2026-27 | 3,490 | 90.5% | 1.6% |
| Period 2 of 2026-27 | 3,472 | 88.6% | 1.2% |
| Period 1 of 2026-27 | 3,995 | 89.6% | 1.8% |
| Period 13 of 2025-26 | 3,786 | 88.9% | 1.3% |
| Period 12 of 2025-26 | 3,460 | 90.4% | 1.9% |
| Period 11 of 2025-26 | 3,460 | 89.9% | 1.6% |
| Period 10 of 2025-26 | 3,134 | 86.3% | 2.4% |
| Period 9 of 2025-26 | 3,460 | 81.7% | 3.7% |
| Period 8 of 2025-26 | 3,460 | 82.4% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Jordanhill | 45,634 | 88.5% | 2.2% |
| Port Glasgow | 45,456 | 96.4% | 1.3% |
| Bishopton (Renfrewshire) | 45,434 | 96.2% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out