Jordanhill
JORScotlandManaged by ScotRail
How this station is performing
Jordanhill had 45,634 scheduled stops to Period 7 of 2026-27, about 125 a day. 88.5% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Jordanhill opened on 1 August 1887, 139 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Anniesland is the oldest (1874) and Kelvindale the newest (2005), with Jordanhill in between.
The nearest stations to Jordanhill are Hyndland (0.7 km south-east), Anniesland (0.8 km north), Kelvindale (1.5 km north-east), Partick (1.7 km south-east) and Scotstounhill (1.8 km west). 72 stations lie within 10 km in all. Of the five, Kelvindale is the most punctual at 95.6% and Hyndland the least at 82.7%, with Jordanhill on 88.5%.
Jordanhill has slipped a little, from 91.8% within three minutes in the previous 13 periods to 88.5% in the latest 13, a fall of 3.3 percentage points. Cancellations fell to 2.2% of scheduled stops from 3.1%, which is 0.9 percentage points fewer.
2 of 3 stations of a similar size in Scotland are more punctual than Jordanhill on 88.5%. The comparison group includes Scotstounhill (87.7%), Port Glasgow (96.4%) and Bishopton (Renfrewshire) (96.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 45,634 | 88.5% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at Jordanhill? Delay Repay
These operators call at Jordanhill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,484 | 85.3% | 3.0% |
| Period 6 of 2026-27 | 3,484 | 89.2% | 1.5% |
| Period 5 of 2026-27 | 3,488 | 88.7% | 1.5% |
| Period 4 of 2026-27 | 3,462 | 89.9% | 4.5% |
| Period 3 of 2026-27 | 3,490 | 90.5% | 1.6% |
| Period 2 of 2026-27 | 3,472 | 88.9% | 1.2% |
| Period 1 of 2026-27 | 3,995 | 91.4% | 1.7% |
| Period 13 of 2025-26 | 3,786 | 89.8% | 1.3% |
| Period 12 of 2025-26 | 3,460 | 90.6% | 1.9% |
| Period 11 of 2025-26 | 3,460 | 91.3% | 1.6% |
| Period 10 of 2025-26 | 3,133 | 86.5% | 2.4% |
| Period 9 of 2025-26 | 3,460 | 82.9% | 3.7% |
| Period 8 of 2025-26 | 3,460 | 83.6% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Scotstounhill | 45,649 | 87.7% | 2.2% |
| Port Glasgow | 45,456 | 96.4% | 1.3% |
| Bishopton (Renfrewshire) | 45,434 | 96.2% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out