Sanderstead
SNRLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
Sanderstead had 27,089 scheduled stops to Period 7 of 2026-27, about 74 a day. 83.6% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Sanderstead opened on 10 March 1884, 142 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Purley is the oldest (1841) and Riddlesdown the newest (1927), with Sanderstead in between.
The nearest stations to Sanderstead are Purley Oaks (0.4 km south-west), South Croydon (1.6 km north), Riddlesdown (1.8 km south), Purley (1.9 km south-west) and Waddon (2.7 km north-west). 62 stations lie within 10 km in all. Of the five, Waddon is the most punctual at 90.9% and Purley Oaks the least at 78.1%, with Sanderstead on 83.6%.
Sanderstead takes its name from an area of London called Sanderstead, home to about 12,777 people, and the station stands 1.6 km from its centre.
Sanderstead has slipped a little, from 87.9% within three minutes in the previous 13 periods to 83.6% in the latest 13, a fall of 4.3 percentage points. Cancellations held steady at 2.7% of scheduled stops, against 2.4% before.
Compared with 3 stations of a similar size in London, Sanderstead is the least punctual, at 83.6%. All of them are ahead, including Fulwell (85.5%), Hampton (London) (87.8%) and Ponders End (87.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 27,089 | 83.6% | 2.7% |
Operators with their own page for this station are linked to it.
Late train at Sanderstead? Delay Repay
These operators call at Sanderstead and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,134 | 73.0% | 3.4% |
| Period 6 of 2026-27 | 2,136 | 79.6% | 2.3% |
| Period 5 of 2026-27 | 2,148 | 77.4% | 4.4% |
| Period 4 of 2026-27 | 2,151 | 85.6% | 2.1% |
| Period 3 of 2026-27 | 2,084 | 80.4% | 2.0% |
| Period 2 of 2026-27 | 1,901 | 89.8% | 1.3% |
| Period 1 of 2026-27 | 2,425 | 90.6% | 1.1% |
| Period 13 of 2025-26 | 2,284 | 88.6% | 2.5% |
| Period 12 of 2025-26 | 2,119 | 84.8% | 2.5% |
| Period 11 of 2025-26 | 1,894 | 83.7% | 3.5% |
| Period 10 of 2025-26 | 1,810 | 85.0% | 3.2% |
| Period 9 of 2025-26 | 1,968 | 82.1% | 3.6% |
| Period 8 of 2025-26 | 2,035 | 84.8% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Fulwell | 26,590 | 85.5% | 4.0% |
| Hampton (London) | 26,590 | 87.8% | 4.7% |
| Ponders End | 26,541 | 87.7% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out