Fulwell
FLWLondonManaged by South Western Railway
How this station is performing
Fulwell had 26,590 scheduled stops to Period 7 of 2026-27, about 73 a day. 85.5% of recorded arrivals were within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
Fulwell opened on 1 November 1864, 162 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Twickenham is the oldest (1848) and Whitton (London) the newest (1930), with Fulwell in between.
The nearest stations to Fulwell are Strawberry Hill (0.9 km north-east), Teddington (1.5 km south-east), Whitton (London) (1.8 km north), Twickenham (2.3 km north-east) and Hampton (London) (2.5 km south-west). 57 stations lie within 10 km in all. At 85.5%, Fulwell is less punctual than all of them; the best of the five, Whitton (London), manages 91.1%.
Fulwell is one of 4 stations named after an area of London called Fulwell, home to about 10,131 people; this one stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Fulwell was Period 9 of 2024-25, at 56.6%, some time before the latest year. The strongest was Period 5 of 2023-24, at 96.4%, and the two are 39.8 percentage points apart. Cancellations peaked at 10.4% of scheduled stops in Period 3 of 2026-27, against 4.0% over the latest 13 periods.
2 of 3 stations of a similar size in London are more punctual than Fulwell on 85.5%. The comparison group includes Hampton (London) (87.8%), Ponders End (87.7%) and Knockholt (81.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 26,590 | 85.5% | 4.0% |
Operators with their own page for this station are linked to it.
Late train at Fulwell? Delay Repay
These operators call at Fulwell and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,026 | 90.0% | 2.1% |
| Period 6 of 2026-27 | 2,047 | 88.6% | 2.3% |
| Period 5 of 2026-27 | 2,052 | 87.0% | 2.2% |
| Period 4 of 2026-27 | 1,949 | 87.9% | 2.1% |
| Period 3 of 2026-27 | 1,995 | 86.0% | 10.4% |
| Period 2 of 2026-27 | 2,034 | 81.3% | 5.0% |
| Period 1 of 2026-27 | 2,355 | 89.6% | 3.2% |
| Period 13 of 2025-26 | 2,255 | 90.0% | 2.0% |
| Period 12 of 2025-26 | 1,941 | 80.1% | 4.7% |
| Period 11 of 2025-26 | 2,056 | 85.6% | 2.5% |
| Period 10 of 2025-26 | 1,795 | 84.6% | 4.6% |
| Period 9 of 2025-26 | 2,059 | 78.5% | 3.4% |
| Period 8 of 2025-26 | 2,026 | 80.8% | 7.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hampton (London) | 26,590 | 87.8% | 4.7% |
| Ponders End | 26,541 | 87.7% | 2.5% |
| Knockholt | 26,345 | 81.0% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out