Ponders End
PONLondonManaged by Greater Anglia
How this station is performing
Ponders End had 26,541 scheduled stops to Period 7 of 2026-27, about 73 a day. 87.7% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Ponders End opened on 15 September 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Ponders End is the oldest; the next oldest, Enfield Lock, dates from 1855.
The nearest stations to Ponders End are Brimsdown (1.4 km north), Southbury (1.4 km north-west), Bush Hill Park (2.4 km west), Edmonton Green (2.7 km south-west) and Enfield Lock (3.1 km north). 49 stations lie within 10 km in all. Of the five, Edmonton Green is the most punctual at 94.4% and Brimsdown the least at 86.4%, with Ponders End on 87.7%.
Ponders End takes its name from an area of London called Ponders End, home to about 15,664 people, and the station stands 0.6 km from its centre.
For Ponders End, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 84.4% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2023-24, at 95.6%, which is 11.2 percentage points higher. Cancellations peaked at 7.2% of scheduled stops in Period 11 of 2023-24, against 2.5% over the latest 13 periods.
1 of 3 stations of a similar size in London are more punctual than Ponders End on 87.7%. The comparison group includes Fulwell (85.5%), Hampton (London) (87.8%) and Knockholt (81.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 26,541 | 87.7% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Ponders End? Delay Repay
These operators call at Ponders End and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,026 | 89.0% | 2.5% |
| Period 6 of 2026-27 | 2,064 | 86.4% | 2.2% |
| Period 5 of 2026-27 | 2,056 | 85.0% | 3.7% |
| Period 4 of 2026-27 | 2,032 | 84.9% | 1.7% |
| Period 3 of 2026-27 | 1,992 | 85.6% | 3.3% |
| Period 2 of 2026-27 | 1,755 | 90.9% | 1.9% |
| Period 1 of 2026-27 | 2,248 | 91.1% | 3.2% |
| Period 13 of 2025-26 | 2,273 | 86.4% | 2.4% |
| Period 12 of 2025-26 | 2,132 | 87.3% | 3.1% |
| Period 11 of 2025-26 | 2,034 | 90.2% | 1.1% |
| Period 10 of 2025-26 | 1,877 | 91.1% | 1.2% |
| Period 9 of 2025-26 | 2,026 | 84.4% | 2.3% |
| Period 8 of 2025-26 | 2,026 | 88.1% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Fulwell | 26,590 | 85.5% | 4.0% |
| Hampton (London) | 26,590 | 87.8% | 4.7% |
| Knockholt | 26,345 | 81.0% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out