Milliken Park
MINScotlandManaged by ScotRail
How this station is performing
Milliken Park had 25,064 scheduled stops to Period 7 of 2026-27, about 69 a day. 91.1% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Milliken Park opened on 15 May 1989, 37 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Milliken Park is the newest; the oldest, Johnstone (Renfrewshire), opened in 1840.
The nearest stations to Milliken Park are Johnstone (Renfrewshire) (2.2 km north-east), Howwood (Renfrewshire) (2.4 km south-west), Paisley St James (6.5 km north-east), Lochwinnoch (6.6 km south-west) and Paisley Canal (7.2 km east). 10 stations lie within 10 km in all. Of the five, Paisley St James is the most punctual at 95.2% and Lochwinnoch the least at 89.4%, with Milliken Park on 91.1%.
For Milliken Park, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 85.0% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2026-27, at 95.1%, which is 10.1 percentage points higher. Cancellations peaked at 6.6% of scheduled stops in Period 9 of 2025-26, against 1.8% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Milliken Park is the most punctual, at 91.1%. The comparison group includes Saltcoats (90.0%), Stevenston (90.0%) and Ardrossan South Beach (86.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 25,064 | 91.1% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Milliken Park? Delay Repay
These operators call at Milliken Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,959 | 89.6% | 1.3% |
| Period 6 of 2026-27 | 1,957 | 92.3% | 0.7% |
| Period 5 of 2026-27 | 1,960 | 91.5% | 0.5% |
| Period 4 of 2026-27 | 1,960 | 91.8% | 1.3% |
| Period 3 of 2026-27 | 1,960 | 94.8% | 0.9% |
| Period 2 of 2026-27 | 1,960 | 91.9% | 1.5% |
| Period 1 of 2026-27 | 2,260 | 95.1% | 3.3% |
| Period 13 of 2025-26 | 1,630 | 92.4% | 1.0% |
| Period 12 of 2025-26 | 1,960 | 93.0% | 1.1% |
| Period 11 of 2025-26 | 1,960 | 89.9% | 0.6% |
| Period 10 of 2025-26 | 1,699 | 88.3% | 1.5% |
| Period 9 of 2025-26 | 1,874 | 85.0% | 6.6% |
| Period 8 of 2025-26 | 1,925 | 87.9% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Saltcoats | 24,972 | 90.0% | 2.2% |
| Stevenston | 24,972 | 90.0% | 2.2% |
| Ardrossan South Beach | 24,971 | 86.1% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out