Rutherglen
RUTScotlandManaged by ScotRail
How this station is performing
Rutherglen had 71,339 scheduled stops to Period 7 of 2026-27, about 196 a day. 83.5% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Rutherglen opened on 1 June 1849. It was moved to the site it uses now on 5 November 1979. Of the 5 stations nearest to it with a known opening date, Rutherglen is the oldest; the next oldest, Dalmarnock, dates from 1895.
The nearest stations to Rutherglen are Dalmarnock (1.3 km north), Burnside (South Lanarkshire) (1.6 km south), Croftfoot (1.7 km south-west), Bridgeton (2.1 km north) and Kings Park (2.4 km south-west). 75 stations lie within 10 km in all. At 83.5%, Rutherglen is less punctual than all of them; the best of the five, Croftfoot, manages 94.3%.
Rutherglen takes its name from a town called Rutherglen, home to about 31,190 people, and the station stands 0.7 km from its centre.
The time of year matters a great deal for Rutherglen. Averaged over every railway year in the data, period 8 (late October and November) is the weakest at 78.0%, while period 1 (April) is the strongest at 89.4%, a spread of 11.4 percentage points.
Compared with 3 stations of a similar size in Scotland, Rutherglen is the least punctual, at 83.5%. All of them are ahead, including Exhibition Centre (Glasgow) (84.9%), Newton (Lanark) (88.7%) and Bridgeton (86.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 71,339 | 83.5% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Rutherglen? Delay Repay
These operators call at Rutherglen and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,440 | 78.5% | 2.4% |
| Period 6 of 2026-27 | 5,442 | 84.0% | 0.8% |
| Period 5 of 2026-27 | 5,450 | 83.8% | 1.2% |
| Period 4 of 2026-27 | 5,396 | 85.6% | 3.1% |
| Period 3 of 2026-27 | 5,442 | 84.6% | 0.8% |
| Period 2 of 2026-27 | 5,428 | 84.5% | 1.1% |
| Period 1 of 2026-27 | 6,236 | 85.3% | 1.4% |
| Period 13 of 2025-26 | 5,942 | 86.7% | 1.0% |
| Period 12 of 2025-26 | 5,425 | 85.7% | 1.3% |
| Period 11 of 2025-26 | 5,417 | 86.9% | 1.2% |
| Period 10 of 2025-26 | 4,869 | 82.9% | 2.1% |
| Period 9 of 2025-26 | 5,432 | 79.0% | 2.5% |
| Period 8 of 2025-26 | 5,420 | 77.1% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Exhibition Centre (Glasgow) | 71,126 | 84.9% | 1.9% |
| Newton (Lanark) | 72,038 | 88.7% | 2.0% |
| Bridgeton | 70,346 | 86.1% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out