How this station is performing
Rickmansworth has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 17,623 scheduled stops, about 48 a day. In those periods 86.0% of stops arrived within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Rickmansworth opened on 1 September 1887, 139 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bushey is the oldest (1841) and Carpenders Park the newest (1914), with Rickmansworth in between.
The nearest stations to Rickmansworth are Chorleywood (3.5 km north-west), Watford High Street (5.7 km east), Watford Junction (5.9 km north-east), Bushey (6.1 km east) and Carpenders Park (6.2 km east). 17 stations lie within 10 km in all. Of the five, Carpenders Park is the most punctual at 86.9% and Watford Junction the least at 81.5%, with Rickmansworth on 86.0%.
Rickmansworth takes its name from a town called Rickmansworth, home to about 23,973 people, and the station stands 0.6 km from its centre.
2 of 3 stations of a similar size in East of England are more punctual than Rickmansworth on 86.0%. The comparison group includes Harwich International (92.8%), Shelford (Cambs) (87.7%) and Kings Lynn (65.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 17,623 | 86.0% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Rickmansworth? Delay Repay
These operators call at Rickmansworth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,451 | 82.1% | 1.4% |
| Period 6 of 2026-27 | 1,490 | 86.2% | 4.5% |
| Period 5 of 2026-27 | 1,444 | 87.0% | 1.3% |
| Period 4 of 2026-27 | 1,435 | 84.5% | 0.6% |
| Period 3 of 2026-27 | 1,162 | 85.0% | 2.1% |
| Period 2 of 2026-27 | 1,340 | 88.9% | 0.7% |
| Period 1 of 2026-27 | 1,353 | – | 0.8% |
| Period 13 of 2025-26 | 1,490 | 91.4% | 1.5% |
| Period 12 of 2025-26 | 1,302 | 89.7% | 0.5% |
| Period 11 of 2025-26 | 1,399 | 88.4% | 2.1% |
| Period 10 of 2025-26 | 951 | 86.9% | 1.7% |
| Period 9 of 2025-26 | 1,501 | 81.6% | 1.8% |
| Period 8 of 2025-26 | 1,305 | 81.0% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Harwich International | 17,664 | 92.8% | 1.1% |
| Shelford (Cambs) | 17,986 | 87.7% | 1.8% |
| Kings Lynn | 17,260 | 65.1% | 9.8% |