Shelford (Cambs)
SEDEast of EnglandManaged by Greater Anglia
How this station is performing
Shelford (Cambs) had 17,986 scheduled stops to Period 7 of 2026-27, about 49 a day. 87.7% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Shelford (Cambs) opened on 30 July 1845, 181 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Shelford (Cambs) is the oldest; the next oldest, Cambridge, dates from 1845.
The nearest stations to Shelford (Cambs) are Cambridge (5.0 km north), Whittlesford Parkway (5.4 km south), Foxton (6.6 km south-west), Shepreth (8.4 km south-west) and Cambridge North (8.5 km north). 5 stations lie within 10 km in all. At 87.7%, Shelford (Cambs) is more punctual than every one of them; the best of the five, Whittlesford Parkway, manages 86.2%.
Shelford (Cambs) is named after Great Shelford, a Village, home to about 4,534 people, but the station stands 0.3 km from its centre.
For Shelford (Cambs), the weakest four-week period in the data is a recent one: Period 5 of 2026-27, when only 83.1% of stops arrived within three minutes of the timetable. The strongest was Period 6 of 2024-25, at 94.9%, which is 11.8 percentage points higher.
1 of 3 stations of a similar size in East of England are more punctual than Shelford (Cambs) on 87.7%. The comparison group includes Great Chesterford (86.1%), Hatfield Peverel (89.1%) and Elsenham (Essex) (87.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 17,986 | 87.7% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Shelford (Cambs)? Delay Repay
These operators call at Shelford (Cambs) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,433 | 84.2% | 2.7% |
| Period 6 of 2026-27 | 1,424 | 86.0% | 1.8% |
| Period 5 of 2026-27 | 1,435 | 83.1% | 4.7% |
| Period 4 of 2026-27 | 1,407 | 85.8% | 2.1% |
| Period 3 of 2026-27 | 1,412 | 85.8% | 1.3% |
| Period 2 of 2026-27 | 1,178 | 90.5% | 0.9% |
| Period 1 of 2026-27 | 1,611 | 91.7% | 1.7% |
| Period 13 of 2025-26 | 1,590 | 90.7% | 0.6% |
| Period 12 of 2025-26 | 1,442 | 90.7% | 1.7% |
| Period 11 of 2025-26 | 1,374 | 89.8% | 1.2% |
| Period 10 of 2025-26 | 901 | 88.7% | 1.2% |
| Period 9 of 2025-26 | 1,388 | 83.6% | 0.9% |
| Period 8 of 2025-26 | 1,391 | 89.7% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Chesterford | 18,004 | 86.1% | 1.8% |
| Hatfield Peverel | 18,035 | 89.1% | 1.0% |
| Elsenham (Essex) | 18,277 | 87.4% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out