Rice Lane
RILNorth WestManaged by Merseyrail
How this station is performing
Rice Lane had 42,982 scheduled stops to Period 7 of 2026-27, about 118 a day. 90.7% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Rice Lane opened on 20 November 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Rice Lane is the oldest; the next oldest, Fazakerley, dates from 1848.
The nearest stations to Rice Lane are Walton (Merseyside) (0.2 km south-west), Orrell Park (0.5 km north), Aintree (1.9 km north), Bootle New Strand (2.2 km west) and Fazakerley (2.2 km north-east). 42 stations lie within 10 km in all. Of the five, Orrell Park is the most punctual at 94.6% and Fazakerley the least at 87.6%, with Rice Lane on 90.7%.
In North West, Rice Lane ranks 54th of 315 ranked stations. Its 90.7% is 9.3 percentage points better than the area median of 81.4%.
Across the whole run of data, the weakest four-week period for Rice Lane was Period 8 of 2024-25, at 85.2%, some time before the latest year. The strongest was Period 4 of 2023-24, at 97.5%, and the two are 12.3 percentage points apart. Cancellations peaked at 11.0% of scheduled stops in Period 8 of 2023-24, against 1.9% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Rice Lane is the most punctual, at 90.7%. The comparison group includes Fazakerley (87.6%), Kirkby (Merseyside) (89.4%) and Hindley (80.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 42,982 | 90.7% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Rice Lane? Delay Repay
These operators call at Rice Lane and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,308 | 94.6% | 1.5% |
| Period 6 of 2026-27 | 3,327 | 94.0% | 1.0% |
| Period 5 of 2026-27 | 3,308 | 92.1% | 1.2% |
| Period 4 of 2026-27 | 3,122 | 89.5% | 1.1% |
| Period 3 of 2026-27 | 3,057 | 91.7% | 5.1% |
| Period 2 of 2026-27 | 3,319 | 92.7% | 1.1% |
| Period 1 of 2026-27 | 3,660 | 90.8% | 4.6% |
| Period 13 of 2025-26 | 3,639 | 91.7% | 1.6% |
| Period 12 of 2025-26 | 3,315 | 88.2% | 0.8% |
| Period 11 of 2025-26 | 3,326 | 88.1% | 1.9% |
| Period 10 of 2025-26 | 2,962 | 90.1% | 0.7% |
| Period 9 of 2025-26 | 3,310 | 88.1% | 1.6% |
| Period 8 of 2025-26 | 3,329 | 87.5% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Fazakerley | 43,024 | 87.6% | 1.8% |
| Kirkby (Merseyside) | 43,024 | 89.4% | 1.8% |
| Hindley | 43,045 | 80.6% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out