Kirkby (Merseyside)
KIRNorth WestManaged by Merseyrail
How this station is performing
Kirkby (Merseyside) had 43,024 scheduled stops to Period 7 of 2026-27, about 118 a day. 89.4% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Kirkby (Merseyside) opened on 20 November 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Kirkby (Merseyside) is the oldest; the next oldest, Fazakerley, dates from 1848.
The nearest stations to Kirkby (Merseyside) are Headbolt Lane (1.4 km north-east), Maghull (2.9 km north-west), Fazakerley (3.0 km south-west), Old Roan (3.2 km west) and Maghull North (3.6 km north). 28 stations lie within 10 km in all. Of the five, Maghull North is the most punctual at 95.9% and Fazakerley the least at 87.6%, with Kirkby (Merseyside) on 89.4%.
Kirkby (Merseyside) is named after Kirkby, a town, home to about 45,564 people, but the station stands 0.8 km from its centre.
Across the whole run of data, the weakest four-week period for Kirkby (Merseyside) was Period 8 of 2023-24, at 82.2%, some time before the latest year. The strongest was Period 4 of 2023-24, at 96.9%, and the two are 14.7 percentage points apart. Cancellations peaked at 11.4% of scheduled stops in Period 8 of 2023-24, against 1.8% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Kirkby (Merseyside) on 89.4%. The comparison group includes Fazakerley (87.6%), Hindley (80.6%) and Rice Lane (90.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 43,024 | 89.4% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Kirkby (Merseyside)? Delay Repay
These operators call at Kirkby (Merseyside) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,308 | 92.8% | 1.4% |
| Period 6 of 2026-27 | 3,327 | 92.6% | 0.9% |
| Period 5 of 2026-27 | 3,308 | 90.7% | 1.1% |
| Period 4 of 2026-27 | 3,122 | 88.5% | 1.1% |
| Period 3 of 2026-27 | 3,057 | 90.7% | 5.0% |
| Period 2 of 2026-27 | 3,321 | 91.7% | 1.1% |
| Period 1 of 2026-27 | 3,660 | 89.6% | 4.2% |
| Period 13 of 2025-26 | 3,639 | 90.6% | 1.4% |
| Period 12 of 2025-26 | 3,315 | 87.3% | 0.8% |
| Period 11 of 2025-26 | 3,326 | 86.3% | 2.0% |
| Period 10 of 2025-26 | 3,002 | 89.0% | 0.7% |
| Period 9 of 2025-26 | 3,310 | 86.2% | 1.5% |
| Period 8 of 2025-26 | 3,329 | 86.0% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Fazakerley | 43,024 | 87.6% | 1.8% |
| Hindley | 43,045 | 80.6% | 3.1% |
| Rice Lane | 42,982 | 90.7% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out