How this operator is doing here
Great Western Railway had 20,196 scheduled stops at Redruth in the 13 periods to Period 7 of 2026-27, 93% of the station's total. 70.0% of recorded arrivals came within three minutes and 5.9% of stops were cancelled.
Great Western Railway trains at Redruth also serve Camborne (5.7 km south-west, 68.0% on time, 5.9% cancelled), Perranwell (8.3 km east, 86.7% on time, 4.6% cancelled), Penryn (Cornwall) (10.7 km south-east, 88.3% on time, 4.7% cancelled), Truro (12.0 km east, 75.5% on time, 4.9% cancelled), Penmere (13.7 km south-east, 88.0% on time, 4.7% cancelled) and Hayle (14.8 km west, 68.7% on time, 6.5% cancelled), which are the stations on its network closest to Redruth.
Within 30 km of here, Great Western Railway runs best at Carbis Bay, 17.4 km west (97.3%), and worst at Camborne, 5.7 km south-west (68.0%).
The busiest Great Western Railway station within 30 km of Redruth is Truro, 12.0 km east, with about 112 scheduled stops a day.
Great Western Railway at Redruth has slipped sharply. 70.0% of stops came within three minutes of the timetable in the latest 13 periods, 7.4 percentage points worse than the 77.4% recorded in the 13 before. Cancellations rose to 5.9% of scheduled stops from 3.6%, which is 2.3 percentage points more.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,467 | 79.0% | 2.0% |
| Period 6 of 2026-27 | 1,521 | 73.7% | 7.8% |
| Period 5 of 2026-27 | 1,570 | 59.8% | 11.3% |
| Period 4 of 2026-27 | 1,580 | 63.9% | 8.4% |
| Period 3 of 2026-27 | 1,579 | 66.7% | 8.3% |
| Period 2 of 2026-27 | 1,578 | 68.8% | 5.3% |
| Period 1 of 2026-27 | 1,808 | 75.9% | 2.6% |
| Period 13 of 2025-26 | 1,723 | 77.0% | 3.0% |
| Period 12 of 2025-26 | 1,563 | – | 2.6% |
| Period 11 of 2025-26 | 1,577 | 73.5% | 10.0% |
| Period 10 of 2025-26 | 1,395 | 63.7% | 6.9% |
| Period 9 of 2025-26 | 1,259 | – | 6.3% |
| Period 8 of 2025-26 | 1,576 | 64.4% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Redruth
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 1,445 | 58.9% | 14.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out