Oldfield Park
OLFSouth WestManaged by Great Western Railway
How this station is performing
Oldfield Park had 21,842 scheduled stops to Period 7 of 2026-27, about 60 a day. 74.9% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Oldfield Park opened on 18 February 1929, 97 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Oldfield Park is the newest; the oldest, Bath Spa, opened in 1840.
The nearest stations to Oldfield Park are Bath Spa (1.6 km east), Freshford (6.9 km south-east), Avoncliff (8.2 km south-east), Keynsham (9.1 km north-west) and Bradford-on-Avon (9.6 km south-east). 5 stations lie within 10 km in all. Of the five, Avoncliff is the most punctual at 77.6% and Bath Spa the least at 68.5%, with Oldfield Park on 74.9%.
Across the whole run of data, the weakest four-week period for Oldfield Park was Period 9 of 2024-25, at 62.1%, some time before the latest year. The strongest was Period 12 of 2025-26, at 86.4%, and the two are 24.3 percentage points apart. Cancellations peaked at 12.1% of scheduled stops in Period 9 of 2024-25, against 4.5% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Oldfield Park is the most punctual, at 74.9%. The comparison group includes Hamworthy (70.7%), Redruth (69.2%) and Wareham (Dorset) (70.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 21,842 | 74.9% | 4.5% |
Operators with their own page for this station are linked to it.
Late train at Oldfield Park? Delay Repay
These operators call at Oldfield Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,689 | 72.2% | 4.3% |
| Period 6 of 2026-27 | 1,687 | 73.4% | 3.2% |
| Period 5 of 2026-27 | 1,659 | 69.6% | 5.0% |
| Period 4 of 2026-27 | 1,694 | 63.3% | 5.7% |
| Period 3 of 2026-27 | 1,601 | 75.2% | 9.2% |
| Period 2 of 2026-27 | 1,688 | 72.2% | 7.2% |
| Period 1 of 2026-27 | 1,942 | 81.8% | 1.7% |
| Period 13 of 2025-26 | 1,842 | 81.9% | 4.1% |
| Period 12 of 2025-26 | 1,686 | 86.4% | 1.5% |
| Period 11 of 2025-26 | 1,687 | 82.6% | 3.3% |
| Period 10 of 2025-26 | 1,539 | 72.9% | 4.7% |
| Period 9 of 2025-26 | 1,695 | 67.1% | 6.3% |
| Period 8 of 2025-26 | 1,433 | 71.9% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hamworthy | 22,002 | 70.7% | 4.2% |
| Redruth | 21,641 | 69.2% | 6.4% |
| Wareham (Dorset) | 22,143 | 70.5% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out