Hamble
HMESouth EastManaged by South Western Railway
How this station is performing
Hamble had 13,191 scheduled stops to Period 7 of 2026-27, about 36 a day. 78.3% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Hamble opened on 18 January 1942, 84 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hamble is the newest; the oldest, Netley, opened in 1866.
The nearest stations to Hamble are Netley (1.0 km north-west), Bursledon (2.2 km north-east), Sholing (3.7 km north-west), Swanwick (4.5 km east) and Woolston (4.5 km north-west). 14 stations lie within 10 km in all. Of the five, Woolston is the most punctual at 80.7% and Swanwick the least at 77.5%, with Hamble on 78.3%.
Hamble is named after Hamble-le-Rice, a Village, home to about 4,695 people, but the station stands 1.3 km from its centre.
Hamble has slipped sharply. 78.3% of stops came within three minutes of the timetable in the latest 13 periods, 8.2 percentage points worse than the 86.5% recorded in the 13 before. Cancellations held steady at 1.7% of scheduled stops, against 1.3% before.
1 of 3 stations of a similar size in South East are more punctual than Hamble on 78.3%. The comparison group includes Bursledon (78.7%), Redbridge (75.1%) and Sholing (77.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 13,191 | 78.3% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Hamble? Delay Repay
These operators call at Hamble and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,019 | 60.2% | 1.8% |
| Period 6 of 2026-27 | 948 | 53.8% | 1.3% |
| Period 5 of 2026-27 | 1,020 | 74.1% | 1.2% |
| Period 4 of 2026-27 | 985 | 77.0% | 0.5% |
| Period 3 of 2026-27 | 1,014 | 78.4% | 3.1% |
| Period 2 of 2026-27 | 1,020 | 79.2% | 3.5% |
| Period 1 of 2026-27 | 1,166 | 86.0% | 1.3% |
| Period 13 of 2025-26 | 1,116 | 88.9% | 0.4% |
| Period 12 of 2025-26 | 951 | 87.7% | 1.8% |
| Period 11 of 2025-26 | 1,016 | 87.8% | 1.8% |
| Period 10 of 2025-26 | 900 | 85.4% | 1.7% |
| Period 9 of 2025-26 | 1,016 | 78.2% | 1.2% |
| Period 8 of 2025-26 | 1,020 | 79.4% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out