How this operator is doing here
London Overground had 49,636 scheduled stops at Queens Road (Peckham) in the 13 periods to Period 7 of 2026-27, 52% of the station's total. 85.3% of recorded arrivals came within three minutes and 4.5% of stops were cancelled.
London Overground trains at Queens Road (Peckham) also serve Peckham Rye (0.9 km south-west, 90.3% on time, 4.5% cancelled), New Cross Gate (1.2 km east, 91.3% on time, 3.8% cancelled), New Cross (1.7 km east, 93.3% on time, 5.8% cancelled), Brockley (1.8 km south-east, 92.1% on time, 3.7% cancelled), Surrey Quays (2.3 km north, 91.7% on time, 4.4% cancelled) and Denmark Hill (2.3 km west, 93.4% on time, 4.5% cancelled), which are the stations on its network closest to Queens Road (Peckham).
Within 30 km of here, London Overground runs best at Romford, 20.0 km north-east (99.7%), and worst at Finchley Road and Frognal, 12.1 km north-west (75.2%).
The busiest London Overground station within 30 km of Queens Road (Peckham) is Highbury and Islington, 8.7 km north, with about 593 scheduled stops a day.
London Overground at Queens Road (Peckham) has slipped a little, from 89.0% within three minutes in the previous 13 periods to 85.3% in the latest 13, a fall of 3.7 percentage points. Cancellations rose to 4.5% of scheduled stops from 2.3%, which is 2.2 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,846 | 81.9% | 4.2% |
| Period 6 of 2026-27 | 3,302 | 80.2% | 7.5% |
| Period 5 of 2026-27 | 3,942 | 83.4% | 8.2% |
| Period 4 of 2026-27 | 3,856 | 83.2% | 6.3% |
| Period 3 of 2026-27 | 3,995 | 78.7% | 2.3% |
| Period 2 of 2026-27 | 3,707 | 84.2% | 9.5% |
| Period 1 of 2026-27 | 4,565 | 88.6% | 4.6% |
| Period 13 of 2025-26 | 3,969 | 90.2% | 3.2% |
| Period 12 of 2025-26 | 3,871 | 89.6% | 2.0% |
| Period 11 of 2025-26 | 3,980 | 87.1% | 4.1% |
| Period 10 of 2025-26 | 2,965 | 86.4% | 2.3% |
| Period 9 of 2025-26 | 3,742 | 86.0% | 2.5% |
| Period 8 of 2025-26 | 3,896 | 87.8% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Queens Road (Peckham)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 46,137 | 94.8% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out