Queens Road (Peckham)
QRPLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
Queens Road (Peckham) had 95,773 scheduled stops to Period 7 of 2026-27, about 263 a day. 89.9% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Queens Road (Peckham) opened on 13 August 1866, 160 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, New Cross Gate is the oldest (1839) and Nunhead the newest (1871), with Queens Road (Peckham) in between.
The nearest stations to Queens Road (Peckham) are Nunhead (0.9 km south-east), Peckham Rye (0.9 km south-west), New Cross Gate (1.2 km east), South Bermondsey (1.6 km north) and New Cross (1.7 km east). 139 stations lie within 10 km in all. Of the five, South Bermondsey is the most punctual at 94.1% and Nunhead the least at 85.8%, with Queens Road (Peckham) on 89.9%.
2 operators call at Queens Road (Peckham): London Overground (85.3%, 52% of stops) and GTR (94.8%, 48% of stops). The operator you travel with matters: GTR reaches 94.8% within three minutes while London Overground manages 85.3%, a gap of 9.5 percentage points.
1 of 3 stations of a similar size in London are more punctual than Queens Road (Peckham) on 89.9%. The comparison group includes Limehouse (91.0%), Herne Hill (81.3%) and Tulse Hill (89.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 49,636 | 85.3% | 4.5% |
| GTR | 46,137 | 94.8% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Queens Road (Peckham)? Delay Repay
These operators call at Queens Road (Peckham) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,490 | 86.6% | 3.6% |
| Period 6 of 2026-27 | 6,339 | 85.8% | 5.3% |
| Period 5 of 2026-27 | 7,587 | 87.7% | 6.3% |
| Period 4 of 2026-27 | 7,499 | 89.2% | 4.4% |
| Period 3 of 2026-27 | 7,514 | 86.4% | 2.2% |
| Period 2 of 2026-27 | 7,273 | 90.0% | 6.5% |
| Period 1 of 2026-27 | 8,699 | 92.1% | 3.3% |
| Period 13 of 2025-26 | 7,901 | 93.3% | 3.3% |
| Period 12 of 2025-26 | 7,452 | 92.8% | 2.3% |
| Period 11 of 2025-26 | 7,376 | 91.2% | 3.1% |
| Period 10 of 2025-26 | 5,774 | 90.2% | 2.7% |
| Period 9 of 2025-26 | 7,323 | 91.4% | 1.4% |
| Period 8 of 2025-26 | 7,546 | 91.4% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Limehouse | 96,134 | 91.0% | 2.0% |
| Herne Hill | 94,823 | 81.3% | 5.4% |
| Tulse Hill | 94,694 | 89.6% | 5.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out