GTR at Queens Road (Peckham)
How this operator is doing here
GTR had 46,137 scheduled stops at Queens Road (Peckham) in the 13 periods to Period 7 of 2026-27, 48% of the station's total. 94.8% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
GTR trains at Queens Road (Peckham) also serve Nunhead (0.9 km south-east, 85.6% on time, 4.2% cancelled), Peckham Rye (0.9 km south-west, 91.6% on time, 3.2% cancelled), New Cross Gate (1.2 km east, 92.9% on time, 3.7% cancelled), South Bermondsey (1.6 km north, 94.1% on time, 2.5% cancelled), Brockley (1.8 km south-east, 94.1% on time, 3.7% cancelled) and Deptford (2.2 km east, 84.1% on time, 6.8% cancelled), which are the stations on its network closest to Queens Road (Peckham).
Within 30 km of here, GTR runs best at Beckenham Junction, 7.3 km south (98.1%), and worst at Kenley, 16.9 km south (66.9%).
The busiest GTR station within 30 km of Queens Road (Peckham) is East Croydon, 11.2 km south, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Queens Road (Peckham), GTR is the most punctual, at 94.8%.
For GTR, Queens Road (Peckham) is the 7th best of 307 ranked stations. Its 94.8% here is 11.9 percentage points above the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,644 | 91.5% | 2.9% |
| Period 6 of 2026-27 | 3,037 | 91.5% | 3.1% |
| Period 5 of 2026-27 | 3,645 | 92.1% | 4.2% |
| Period 4 of 2026-27 | 3,643 | 95.2% | 2.4% |
| Period 3 of 2026-27 | 3,519 | 95.1% | 2.2% |
| Period 2 of 2026-27 | 3,566 | 95.6% | 3.3% |
| Period 1 of 2026-27 | 4,134 | 95.8% | 1.8% |
| Period 13 of 2025-26 | 3,932 | 96.4% | 3.5% |
| Period 12 of 2025-26 | 3,581 | 96.3% | 2.7% |
| Period 11 of 2025-26 | 3,396 | 95.9% | 2.0% |
| Period 10 of 2025-26 | 2,809 | 94.3% | 3.1% |
| Period 9 of 2025-26 | 3,581 | 96.8% | 0.3% |
| Period 8 of 2025-26 | 3,650 | 95.3% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Queens Road (Peckham)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 49,636 | 85.3% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out