Herne Hill
HNHLondonManaged by Southeastern
How this station is performing
Herne Hill had 94,823 scheduled stops to Period 7 of 2026-27, about 260 a day. 81.3% of recorded arrivals were within three minutes of the timetable and 5.4% of scheduled stops were cancelled.
Herne Hill opened on 25 August 1862, 164 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Herne Hill is the oldest; the next oldest, Brixton, dates from 1862.
The nearest stations to Herne Hill are North Dulwich (1.0 km east), Brixton (1.3 km north-west), Loughborough Junction (1.4 km north), Tulse Hill (1.5 km south) and West Dulwich (1.7 km south-east). 125 stations lie within 10 km in all. At 81.3%, Herne Hill is less punctual than all of them; the best of the five, North Dulwich, manages 95.2%.
Herne Hill takes its name from an area of London called Herne Hill, and the station stands 0.6 km from its centre.
2 operators call at Herne Hill: GTR (81.7%, 51% of stops) and Southeastern (80.8%, 49% of stops). They are close together, with GTR leading on 81.7% and Southeastern trailing on 80.8%, a gap of 0.9 percentage points.
Compared with 3 stations of a similar size in London, Herne Hill is the least punctual, at 81.3%. All of them are ahead, including Tulse Hill (89.6%), West Ealing (87.6%) and Queens Road (Peckham) (89.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 48,301 | 81.7% | 8.2% |
| Southeastern | 46,522 | 80.8% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Herne Hill? Delay Repay
These operators call at Herne Hill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,570 | 78.8% | 3.8% |
| Period 6 of 2026-27 | 7,489 | 75.9% | 6.6% |
| Period 5 of 2026-27 | 6,429 | 72.5% | 7.9% |
| Period 4 of 2026-27 | 7,630 | 83.6% | 4.2% |
| Period 3 of 2026-27 | 7,058 | 80.1% | 6.0% |
| Period 2 of 2026-27 | 6,958 | 84.6% | 4.4% |
| Period 1 of 2026-27 | 8,201 | 87.6% | 4.0% |
| Period 13 of 2025-26 | 8,210 | 86.9% | 3.9% |
| Period 12 of 2025-26 | 7,645 | 83.9% | 3.8% |
| Period 11 of 2025-26 | 7,576 | 81.5% | 4.9% |
| Period 10 of 2025-26 | 5,178 | 80.5% | 9.5% |
| Period 9 of 2025-26 | 7,265 | 78.3% | 8.4% |
| Period 8 of 2025-26 | 7,614 | 78.9% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Tulse Hill | 94,694 | 89.6% | 5.4% |
| West Ealing | 94,038 | 87.6% | 4.8% |
| Queens Road (Peckham) | 95,773 | 89.9% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out