Purley Oaks
PUOLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
Purley Oaks had 26,341 scheduled stops to Period 7 of 2026-27, about 72 a day. 78.1% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Purley Oaks opened on 5 November 1899, 127 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Purley is the oldest (1841) and Riddlesdown the newest (1927), with Purley Oaks in between.
The nearest stations to Purley Oaks are Sanderstead (0.4 km north-east), Purley (1.5 km south-west), Riddlesdown (1.6 km south), South Croydon (1.8 km north) and Reedham (London) (2.5 km south-west). 63 stations lie within 10 km in all. At 78.1%, Purley Oaks is less punctual than all of them; the best of the five, Riddlesdown, manages 84.1%.
Purley Oaks is named after Purley, a town, but the station stands 1.5 km from its centre.
Purley Oaks has slipped sharply. 78.1% of stops came within three minutes of the timetable in the latest 13 periods, 5.4 percentage points worse than the 83.5% recorded in the 13 before. Cancellations held steady at 1.5% of scheduled stops, against 1.2% before.
Compared with 3 stations of a similar size in London, Purley Oaks is the least punctual, at 78.1%. All of them are ahead, including Knockholt (81.0%), Ponders End (87.7%) and Fulwell (85.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 26,341 | 78.1% | 1.5% |
Operators with their own page for this station are linked to it.
Late train at Purley Oaks? Delay Repay
These operators call at Purley Oaks and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,982 | 78.4% | 0.8% |
| Period 6 of 2026-27 | 2,037 | 77.6% | 1.6% |
| Period 5 of 2026-27 | 2,055 | 78.3% | 1.5% |
| Period 4 of 2026-27 | 1,986 | 74.0% | 1.6% |
| Period 3 of 2026-27 | 1,971 | 76.1% | 1.0% |
| Period 2 of 2026-27 | 2,057 | 82.1% | 1.6% |
| Period 1 of 2026-27 | 2,272 | 83.6% | 1.0% |
| Period 13 of 2025-26 | 2,256 | 83.6% | 0.9% |
| Period 12 of 2025-26 | 1,991 | 72.3% | 2.2% |
| Period 11 of 2025-26 | 1,849 | 74.4% | 1.5% |
| Period 10 of 2025-26 | 1,783 | 79.3% | 1.0% |
| Period 9 of 2025-26 | 2,041 | 74.8% | 3.8% |
| Period 8 of 2025-26 | 2,061 | 78.6% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Knockholt | 26,345 | 81.0% | 1.4% |
| Ponders End | 26,541 | 87.7% | 2.5% |
| Fulwell | 26,590 | 85.5% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out