Transport for Wales at Prestatyn
All trains at PrestatynTransport for Wales across BritainWales
How this operator is doing here
Transport for Wales had 25,868 scheduled stops at Prestatyn in the 13 periods to Period 7 of 2026-27, 84% of the station's total. 75.9% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Transport for Wales trains at Prestatyn also serve Rhyl (5.8 km west, 76.9% on time, 2.0% cancelled), Abergele and Pensarn (12.6 km west, 75.8% on time, 1.4% cancelled), Flint (20.6 km south-east, 75.5% on time, 2.0% cancelled), Colwyn Bay (21.6 km west, 80.2% on time, 2.1% cancelled), Upton (Merseyside) (22.1 km east, 77.1% on time, 4.0% cancelled) and Heswall (22.2 km east, 75.6% on time, 4.0% cancelled), which are the stations on its network closest to Prestatyn.
Within 30 km of here, Transport for Wales runs best at Llandudno, 28.0 km west (89.6%), and worst at Hawarden Bridge, 28.2 km south-east (73.6%).
The busiest Transport for Wales station within 30 km of Prestatyn is Llandudno Junction, 27.3 km west, with about 105 scheduled stops a day.
Of the 2 operators with enough records at Prestatyn, Transport for Wales is the most punctual, at 75.9%.
Over three full railway years Transport for Wales at Prestatyn has improved each time, from 73.1% within three minutes in 2023-24 to 75.3% in 2024-25 and 78.0% in 2025-26.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,400 | 77.1% | 1.6% |
| Period 6 of 2026-27 | 2,410 | 67.8% | 3.2% |
| Period 5 of 2026-27 | 2,307 | 71.7% | 2.3% |
| Period 4 of 2026-27 | 2,336 | 73.8% | 2.0% |
| Period 3 of 2026-27 | 2,185 | 74.0% | 3.0% |
| Period 2 of 2026-27 | 2,053 | 71.8% | 2.1% |
| Period 1 of 2026-27 | 1,977 | 81.2% | 1.7% |
| Period 13 of 2025-26 | 1,871 | 83.2% | 1.8% |
| Period 12 of 2025-26 | 1,710 | 84.0% | 1.1% |
| Period 11 of 2025-26 | 1,657 | 83.7% | 2.2% |
| Period 10 of 2025-26 | 1,568 | 79.7% | 1.5% |
| Period 9 of 2025-26 | 1,713 | 70.2% | 1.8% |
| Period 8 of 2025-26 | 1,681 | 73.2% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Prestatyn
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 4,775 | 71.8% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out