Pontefract Tanshelf
POTYorkshire and The HumberManaged by Northern Trains
How this station is performing
Pontefract Tanshelf had 11,180 scheduled stops to Period 7 of 2026-27, about 31 a day. 76.9% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Pontefract Tanshelf opened on 17 July 1871 and closed to passengers on 2 January 1967. It reopened on 11 May 1992, 34 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Castleford is the oldest (1840) and Glasshoughton the newest (2005), with Pontefract Tanshelf in between.
The nearest stations to Pontefract Tanshelf are Pontefract Baghill (1.1 km east), Pontefract Monkhill (1.1 km north-east), Glasshoughton (2.3 km north-west), Featherstone (3.1 km south-west) and Castleford (4.1 km north-west). 9 stations lie within 10 km in all. Of the five, Glasshoughton is the most punctual at 80.2% and Pontefract Baghill the least at 64.7%, with Pontefract Tanshelf on 76.9%.
Pontefract Tanshelf is named after Pontefract, a market town, home to about 30,881 people, but the station stands 0.6 km from its centre.
1 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Pontefract Tanshelf on 76.9%. The comparison group includes Featherstone (75.5%), Streethouse (76.5%) and Filey (80.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,180 | 76.9% | 2.8% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 848 | 79.7% | 2.6% |
| Period 6 of 2026-27 | 852 | 82.0% | 1.4% |
| Period 5 of 2026-27 | 852 | 79.3% | 2.8% |
| Period 4 of 2026-27 | 844 | 79.2% | 6.5% |
| Period 3 of 2026-27 | 852 | 76.8% | 4.7% |
| Period 2 of 2026-27 | 852 | 77.4% | 4.2% |
| Period 1 of 2026-27 | 983 | 80.5% | 2.2% |
| Period 13 of 2025-26 | 929 | 82.1% | 1.8% |
| Period 12 of 2025-26 | 852 | 75.6% | 1.8% |
| Period 11 of 2025-26 | 848 | 72.6% | 2.5% |
| Period 10 of 2025-26 | 769 | 72.7% | 2.1% |
| Period 9 of 2025-26 | 852 | 68.4% | 2.5% |
| Period 8 of 2025-26 | 847 | 72.7% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Featherstone | 11,180 | 75.5% | 2.8% |
| Streethouse | 11,180 | 76.5% | 2.8% |
| Filey | 10,824 | 80.0% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out