Featherstone
FEAYorkshire and The HumberManaged by Northern Trains
How this station is performing
Featherstone had 11,180 scheduled stops to Period 7 of 2026-27, about 31 a day. 75.5% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Featherstone opened on 1 April 1848 and closed to passengers on 2 January 1967. It reopened on 11 May 1992, 34 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Featherstone is the oldest; the next oldest, Pontefract Monkhill, dates from 1848.
The nearest stations to Featherstone are Streethouse (2.7 km west), Pontefract Tanshelf (3.1 km north-east), Glasshoughton (3.5 km north), Pontefract Baghill (3.9 km east) and Pontefract Monkhill (4.1 km north-east). 12 stations lie within 10 km in all. Of the five, Glasshoughton is the most punctual at 80.2% and Pontefract Baghill the least at 64.7%, with Featherstone on 75.5%.
Featherstone is one of 4 stations named after a town called Featherstone, home to about 18,090 people; this one stands 2.4 km from its centre.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Featherstone is the least punctual, at 75.5%. All of them are ahead, including Pontefract Tanshelf (76.9%), Streethouse (76.5%) and Filey (80.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,180 | 75.5% | 2.8% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 848 | 77.5% | 2.6% |
| Period 6 of 2026-27 | 852 | 81.9% | 1.5% |
| Period 5 of 2026-27 | 852 | 76.9% | 2.9% |
| Period 4 of 2026-27 | 844 | 78.8% | 6.5% |
| Period 3 of 2026-27 | 852 | 75.1% | 4.7% |
| Period 2 of 2026-27 | 852 | 76.1% | 4.3% |
| Period 1 of 2026-27 | 983 | 79.7% | 2.3% |
| Period 13 of 2025-26 | 929 | 81.3% | 1.8% |
| Period 12 of 2025-26 | 852 | 75.1% | 1.8% |
| Period 11 of 2025-26 | 848 | 72.4% | 2.5% |
| Period 10 of 2025-26 | 769 | 71.6% | 2.1% |
| Period 9 of 2025-26 | 852 | 63.8% | 2.5% |
| Period 8 of 2025-26 | 847 | 70.1% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Pontefract Tanshelf | 11,180 | 76.9% | 2.8% |
| Streethouse | 11,180 | 76.5% | 2.8% |
| Filey | 10,824 | 80.0% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out