Northern at Pontefract Tanshelf
All trains at Pontefract TanshelfNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 11,180 scheduled stops at Pontefract Tanshelf in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 76.9% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
Northern trains at Pontefract Tanshelf also serve Pontefract Baghill (1.1 km east, 64.7% on time, 1.3% cancelled), Pontefract Monkhill (1.1 km north-east, 79.0% on time, 3.8% cancelled), Glasshoughton (2.3 km north-west, 80.2% on time, 2.9% cancelled), Featherstone (3.1 km south-west, 75.5% on time, 2.8% cancelled), Castleford (4.1 km north-west, 81.8% on time, 3.0% cancelled) and Knottingley (4.2 km east, 85.0% on time, 4.9% cancelled), which are the stations on its network closest to Pontefract Tanshelf.
Within 30 km of here, Northern runs best at Thorne South, 26.0 km south-east (87.9%), and worst at South Milford, 10.8 km north-east (64.6%).
The busiest Northern station within 30 km of Pontefract Tanshelf is Leeds, 18.8 km north-west, with about 780 scheduled stops a day.
Of the 1 operators with enough records at Pontefract Tanshelf, Northern is the most punctual, at 76.9%.
For Northern, Pontefract Tanshelf is the 313th best of 493 ranked stations. Its 76.9% here is 1.7 percentage points below the 78.6% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 848 | 79.7% | 2.6% |
| Period 6 of 2026-27 | 852 | 82.0% | 1.4% |
| Period 5 of 2026-27 | 852 | 79.3% | 2.8% |
| Period 4 of 2026-27 | 844 | 79.2% | 6.5% |
| Period 3 of 2026-27 | 852 | 76.8% | 4.7% |
| Period 2 of 2026-27 | 852 | 77.4% | 4.2% |
| Period 1 of 2026-27 | 983 | 80.5% | 2.2% |
| Period 13 of 2025-26 | 929 | 82.1% | 1.8% |
| Period 12 of 2025-26 | 852 | 75.6% | 1.8% |
| Period 11 of 2025-26 | 848 | 72.6% | 2.5% |
| Period 10 of 2025-26 | 769 | 72.7% | 2.1% |
| Period 9 of 2025-26 | 852 | 68.4% | 2.5% |
| Period 8 of 2025-26 | 847 | 72.7% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out