CrossCountry at Plymouth
How this operator is doing here
CrossCountry had 10,451 scheduled stops at Plymouth in the 13 periods to Period 7 of 2026-27, 23% of the station's total. 69.8% of recorded arrivals came within three minutes and 7.5% of stops were cancelled.
CrossCountry trains at Plymouth also serve Liskeard (24.4 km west, 55.3% on time, 11.6% cancelled), Totnes (32.9 km east, 69.0% on time, 7.5% cancelled), Lostwithiel (37.2 km west, 57.1% on time, 11.5% cancelled), Bodmin Parkway (37.6 km west, 58.9% on time, 11.7% cancelled), Par (39.9 km west, 56.6% on time, 10.7% cancelled) and Paignton (41.5 km east, 74.1% on time, 21.8% cancelled), which are the stations on its network closest to Plymouth.
The busiest CrossCountry station within 30 km of Plymouth is Liskeard, 24.4 km west, with about 4 scheduled stops a day.
Of the 2 operators with enough records at Plymouth, CrossCountry is the most punctual, at 69.8%.
For CrossCountry, Plymouth is the 25th best of 99 ranked stations. Its 69.8% here is 6.6 percentage points above the 63.2% across the whole network.
CrossCountry at Plymouth has slipped sharply. 69.8% of stops came within three minutes of the timetable in the latest 13 periods, 5.1 percentage points worse than the 74.9% recorded in the 13 before. Cancellations rose to 7.5% of scheduled stops from 5.8%, which is 1.7 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 815 | 72.7% | 6.9% |
| Period 6 of 2026-27 | 832 | 64.9% | 11.5% |
| Period 5 of 2026-27 | 839 | 64.2% | 6.6% |
| Period 4 of 2026-27 | 832 | 65.4% | 6.9% |
| Period 3 of 2026-27 | 829 | 67.0% | 4.1% |
| Period 2 of 2026-27 | 828 | 68.3% | 4.0% |
| Period 1 of 2026-27 | 942 | 74.4% | 3.3% |
| Period 13 of 2025-26 | 706 | 74.7% | 5.2% |
| Period 12 of 2025-26 | 622 | 81.3% | 5.6% |
| Period 11 of 2025-26 | 826 | 78.7% | 15.4% |
| Period 10 of 2025-26 | 762 | 69.6% | 15.4% |
| Period 9 of 2025-26 | 830 | 60.2% | 8.2% |
| Period 8 of 2025-26 | 788 | 69.7% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Plymouth
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 35,159 | 69.4% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out